|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00675
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 2:26:20 PM
Creation date
2/6/2017 3:46:34 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00675
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY <br /> 4e j; ,�''a PLANNING ELOPMENT <br /> '� ? ' , s Room 116, City-County Building, Madison, Wisconsin 53703 <br /> �'4,�t awl Iv Fax (608) 267-1540 <br /> ‘kt, coN5 <br /> Housing& <br /> Economic Development <br /> (608)266-4270,Rm.362 <br /> September 11, 2008 <br /> Planning <br /> (608)266-4251,Rm. 116 <br /> Eddy &Sharon Rosengren Records &Support <br /> 83 Koshkonong Drive (608)266-4251,Rm. 116 <br /> Edgerton, WI 53534 <br /> Zoning <br /> (608)266-4266,Rm. 116 <br /> Flood Plain Filling Permit 521-C <br /> Placing fill around the residential structure at 83 Koshkonong Drive, Town of Albion, for Floodplain <br /> Compliance <br /> Dear Mr. Rosengren, <br /> Dane County Zoning Division has reviewed the information prepared by Quam Engineering with regards to placing <br /> fill in the Flood Fringe area. The engineering has been found to conform to Dane County Code of Ordinance, <br /> Chapter 17, Floodplain Regulations. The filling and the grading shall comply with the submitted plan dated August <br /> 27, 2008. <br /> Fill shall be placed to the elevation of 785.2 feet ASL from the edge of the residential structure to a point at least 15 <br /> feet away from the structure wherever practical. <br /> When the project is completed, your engineer will be required to submit an "as built" survey of the property within <br /> 30 days of the completion date designating: <br /> ❑ First Floor elevation of the residential building <br /> ❑ Elevation of the fill that is located 15 feet around the residential structure. <br /> Land disturbance shall not occur until a Shoreland Erosion Control Permit is issued by Dane County Land <br /> Conservation. You can contact them at(608) 224-3730. <br /> Your cooperation is appreciated in this matter. <br /> Respec <br /> Roger <br /> Dane C my Zoning Administrator <br /> CC:DNR Floodplain Management Department <br /> Dane County Land Conservation <br /> Town of Albion Clerk <br /> Quam Engineering <br /> Doc ref: 83 Beach Avenue Fill <br />
The URL can be used to link to this page
Your browser does not support the video tag.