|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00369
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 10:36:48 AM
Creation date
2/7/2017 10:32:36 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00369
Town
Blooming Grove Township
Section Numbers
26
AccelaLink
DCPCUP-0000-00369
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
—, p1 MIIC <br /> fli) State of Wisconsin DEPARTMENT OF TRANSPORTATION <br /> `C4j OI lfl <br /> TRANSPORTATION • DISTRICT 1 <br /> March 7, 1984 1317 Applegate Road <br /> P.0. Box 7877 <br /> Madison,WI 53707-7877 <br /> Mr. Dale Houston <br /> Route 1 <br /> Cottage Grove, WI 53527 <br /> Dear Mr. Houston: <br /> This is in response to your telephone call of March 7. You were in our <br /> office several weeks ago and at that time, you stated that you were proposing <br /> to develop an amusement park near Holiday Inn #2 just off of USH 12. Access <br /> to the park would be via Long Drive which intersects USH 12 just east of <br /> the interchange of USH 12 and IH 90. <br /> Long Drive intersects Highway 12 at a point just east of where the taper <br /> from the ramp off IH 90 ends. USH 12 is a divided roadway at this point, and <br /> a median crossover exists to provide access to the westbound lane of Highway 12 <br /> from Long Drive. <br /> A paved shoulder is in place on Highway 12 through this intersection. <br /> The 1981 traffic volume on USH 12 was 3360 vehicles per day in each direction. <br /> We have no counts on Long Drive. <br /> At some future date, when USH 12 is made a four-lane highway, right-of-way <br /> is available to relocate the Long Drive intersection further east, approxi- <br /> mately 400 feet. This would allow for more space between the off ramp from <br /> IH 90 and the first access point. I wish to emphasize, however, that this <br /> construction is not currently planned. <br /> Since <br /> LeRoy Besler, P.E. <br /> District Planning & Assistance Supervisor <br />
The URL can be used to link to this page
Your browser does not support the video tag.