Laserfiche WebLink
i y � ttt <br /> ,,,„, Dane County Planning & Development <br /> City-County Building, Madison, Wisconsin 53709 <br /> Planning <br /> Room 116,608/266-4251 <br /> Zoning <br /> Room 116,608/266-4266 <br /> FINAL NOTICE Community Development <br /> Room 421,608/261-9781 <br /> NOTICE OF FAILURE TO SUBMIT A LOCATION SURVEY <br /> Records&Support <br /> February 9,2009 Room 116,608/266-4251 <br /> Betty Hodgson <br /> 4433 Beale Street <br /> Madison,WI 53711 <br /> Location : Town of Dunn,Section 08,NW'/of SE 1/4,Parcel#0610-082-6501-1 <br /> When your zoning permit (ZP 2008 0658) was issued a condition was placed upon it. It was <br /> that a location survey will be required to verify locational compliance. A location survey was <br /> required after the foundation was complete. At this time a location survey has not been <br /> submitted. <br /> If you have not obtained a survey, this notice serves as a STOP WORK ORDER. You may <br /> not continue building until this office has received a survey. <br /> Continuation of building without having submitted a location survey constitutes a violation <br /> of the zoning permit conditions and of the Dane County Code of Ordinances, Chaper 10.25 <br /> (see below). Further enforcement actions may result. <br /> Your deadline for submitting the location survey is: March 6,2009. <br /> (30m) Location survey. As indicated in this ordinance refers to survey information prepared by a licensed surveyor indicating the <br /> location of property lines and building location distances from those property lines for the specific portions of the building indicated <br /> in this ordinance. Such surveys are not required to provide all the parcel information set forth by Wisconsin Administrative Code <br /> Chapter A-# 7.02 Minimum Standards for Property Surveys item A-E 7.01 (2) but may exclude unnecessary information as <br /> permitted in A-E 7.01 (2)and provide only the information required by the zoning ordinance but such information must comply with <br /> the accuracy standard required by A-E 7.06 Measurements. <br /> (a)Location Survey <br /> A location survey as defined herein shall be submitted to the zoning division for all construction,which will be located less than 10' <br /> from required setback lines. The survey shall be done at the time when foundations or basement walls are completed. Such survey <br /> shall be submitted to the zoning office prior to the continuation of work on the project. <br /> Respectfully, <br /> 11-44i <br /> Scott Schroeckenthaler-Zoning Inspector-266-4374 <br /> CC:Thomas Gall,Agent <br />