|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00658
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 4:21:50 PM
Creation date
2/8/2017 3:18:37 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00658
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 , a ,z Land Conservation Division <br /> r Dane County Land &Water Resources Department <br /> 4. 1839 <br /> 49C g �y Patrick J.Sutter,County Conservationist <br /> DATE: August 22, 2008 <br /> TO: Betty Hodgson Gall and Tom Gall <br /> FROM: Jeremy Balousek,P.E. <br /> Urban Conservation Engineer <br /> RE: Gall Boathouse(4433 Beale Street)—Shoreland Erosion Control Plan, <br /> SE2008-0190 <br /> The submitted shoreland erosion control plan meets the needs of the site. The plan includes <br /> the following requirements: <br /> 1. The site may only be accessed off Beale Street using the existing paved driveway. No <br /> other site access may be used and material deposited in the road will be cleaned up <br /> throughout and at the end of each workday. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan and where <br /> deemed necessary, including the down slope of all soil stockpiles. The silt fence must be <br /> maintained until the site is vegetated and stabilized. <br /> 3. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as undisturbed on the plan. In the <br /> event any of these areas are disturbed, additional erosion control measures will be <br /> required. <br /> 4. The plan includes a construction schedule as follows: <br /> Grading and construction is planned to begin September 1, 2008. <br /> All disturbed areas on the site must be permanently seeded and mulched by <br /> November 15, 2008. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Land Conservation. This permit will expire on the stabilization date included in the plan <br /> (November 15,2008) and may be amended prior to permit expiration only. This review is <br /> for the erosion control requirements of Chapter 14, Dane County Code of Ordinances only and <br /> other approvals may be necessary. The applicant must obtain a permit card from the Land <br /> Conservation counter and display it on the site prior to disturbing ground. It is <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.