|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00017
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 11:29:44 AM
Creation date
2/15/2017 11:29:42 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> Front Setback area S 72°57' 40" E 254.01' Side Setback area <br /> 1 • <br /> r Rear <br /> w, %% i % %ii%ii% area <br /> /i�����i����i%////// 1 Setback <br /> O ' O <br /> N 10 Feet F <br /> INeeds a Location j I Setback' i%%= Proposed 169.8 / F Addition 00 <br /> CC O 0 <br /> N 35.0 _ is <br /> O— — � N <br /> ti — <br /> o <br /> CO <br /> 1 Z <br /> _ _ "7#7/_ ff igA co <br /> • r <br /> Side Setback area N 72°57'40" W <br /> 33' 33' I I <br /> I <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property,and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning &Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Ow/n/err/ y,/Agent DATE: <br /> SIGNATURE: Owner 'gent / <br /> r <br /> (-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.