|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00631
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 4:18:28 PM
Creation date
2/16/2017 2:56:26 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00631
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,s,, Land Conservation Division <br /> 89 Dane County Land & Water Resources Department <br /> Patrick J.Sutter, County Conservationist <br /> DATE: July 31, 2008 <br /> TO: Dennis and Nancy Lynch <br /> Owners <br /> FROM: Jeremy Balousek, P.E. <br /> Urban Conservation Engineer ' <br /> RE: Lynch Addition—Shoreland Erosion Control Plan, SE2008-0180 <br /> The submitted shoreland erosion control plan meets the needs of the site. The plan includes <br /> the following requirements: <br /> 1. The site may only be accessed off Waubesa Avenue using a stone tracking pad. The pad <br /> must be a minimum of 50' long x 24' wide x 12"deep and be constructed of 3-inch clear <br /> stone. No other site access may be used and material deposited in the road will be <br /> i <br /> cleaned up throughout and at the end of each workday. <br /> 2. Silt fence must be installed prior to grading in the location shown on the plan and where <br /> deemed necessary, including the down slope of all soil stockpiles. The silt fence must be <br /> maintained until the site is vegetated and stabilized. <br /> 3. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as "undisturbed"or"vegetated buffer" <br /> on the plan. In the event any of these areas are disturbed, additional erosion control <br /> measures will be required. <br /> 4. The plan includes a construction schedule as follows: <br /> — <br /> Grading and construction is planned to begin August 11, 2008. t` <br /> 'S �s- All disturbed areas on the site must be permanently seeded and mulched by <br /> September 12, 2008. <br /> The construction site must follow the plan according to the schedule d by Dane C�oun y <br /> Land Conservation. This permit will expire on the stabilization date included in the planty <br /> (September 12,2008) and may be amended prior to permit expiration only. This review is <br /> for the erosion control requirements of Chapter 11, Dane County Code of Ordinances only and <br /> other approvals may be necessary. The applicant must obtain a permit card from the Land �GL ® <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208, Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 '`� <br /> www.countyofdane.com/landconservation �° <br />
The URL can be used to link to this page
Your browser does not support the video tag.