|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00031
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 10:28:04 AM
Creation date
2/17/2017 10:27:57 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if <br /> is within 10 feet of a setback tine. Your construction <br /> • You will need to hire a surveyor to prepare a location survey to verify.the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. • <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> TL <br /> you rmiay'needl'this;rf . ;. <br /> 33' 1 33' I <br /> I <br /> I <br /> 9 Front Setback area S 72°57'40" E 254.01' f—Side setback area I <br /> F <br /> % l R ev O , area <br /> O M O <br /> Needs a 10 Feel / I F T. <br /> °� Location <br /> ® 1 Survey Ø* back <br /> Ad tlond 169.8' floe I ku Cr II <br /> 35. _ iv CV <br /> eta — — —d— 5 �c n <br /> co <br /> 1 z <br /> _: _ �/�I�GLUL4lLG jLGlell/!�/!!/1!/l1GGf I . <br /> ® <br /> I Side Setback area N 72°57'40" W <br /> 33' 33' I <br /> I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, • <br /> and may sign this permit application on behalf of the owner(s)of said property,and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions.I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent -� DATE:/// <br /> SIGNATURE: Owner/Agent 7 <br /> • <br /> R CEIVED <br /> • F E 9 1 4 2017 <br /> DANE COUNTY PLANNING&DEVELOPMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.