Laserfiche WebLink
Page 1 of 1 <br /> Klinkner, Patrick <br /> From: Hilbert, Hans <br /> Sent: Tuesday, September 16, 2008 7:54 AM <br /> To: 'Jerermy Ceranski' <br /> Cc: Klinkner, Patrick <br /> Subject: RE: Keller new construction <br /> Jeremy, <br /> I'm going to forward this on to the jurisdictional inspector, Pat Klinkner, as the permit is under his control now. I <br /> don't see any issues with what you are trying to do, but it will need to be reviewed and Pat has the final say. <br /> Thanks, <br /> • <br /> Hans <br /> Original Message <br /> From: Jerermy Ceranski [mailto:jceranski @fphmortgage.com] <br /> Sent: Monday, September 15, 2008 6:38 PM <br /> To: Hilbert, Hans <br /> Subject: Keller new construction <br /> Hans <br /> In reference to the Keller project. Is it ok to move the house back 10 to 15 feet from the drawing I provided <br /> you, as long as we stay within the set back parameters. It would work out better to set the house back to <br /> take more advantage of the slope for the walk out.•Also, the house must be 10 feet or greater from the <br /> septic system, correct? <br /> Thanks, <br /> Jeremy <br /> No virus found in this outgoing message. <br /> Checked by AVG. <br /> Version: 7.5.524/Virus Database: 270.6.21/1672-Release Date: 9/15/2008 9:21 AM <br /> • <br /> 9/16/2008 <br />