Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location., ' -,•-•. <br /> • The survey shall be done at the time when foundations or basement walls are completed. . <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. ' - <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. • <br /> you may need this if . . . <br /> 33' 33' <br /> Front Setback area S 72°57'40" E 254.01' F Side Setback area • <br /> • Rear <br /> r - 1 Setback <br /> �����������������ii%�/%%�ii%�ii%'/�/.% area <br /> O C <br /> 4 10 Feet c_°, . <br /> O Needs a W <br /> Location 2 <br /> W W <br /> Q w �' <br /> t) Survey Ø+_SethaCk <br /> d %� z m <br /> - - -i 0 '- ° <br /> CO <br /> I Z <br /> - _W/s!1�4 dGGULGUGGU Lll�l1/s%1�!!/1!/.G!�� / .- `j�' <br /> • r <br /> Side Setback area N 72°57'40" W <br /> 33' 33' I I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property,and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions.I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> • <br /> 6a-do 14'Y,tcerlefh©it Bit .io8 <br /> . SIGNATURE: Owner/Agent <br /> Q..t• ` <br />