|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00032
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 12:52:38 PM
Creation date
2/23/2017 12:52:33 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 2/3/2017 <br /> Caller/Contact: Bill Bu inter- Phone#: (608) 839-4688 <br /> Landowner: Same Phone#: <br /> Contact Email: dburmeister @hotmail.com <br /> Project Address: 2015 Uphoff Rd <br /> Location(Municipality): Town of Cottage Grove Section: 14 1/4: NW <br /> Parcel#: 0711-142-9500-9 <br /> Project Description: Construct a 30' x 40' pole barn on south side of existing driveway. <br /> Planned Size of Disturbance: <4,000 ft2 Planned Size of New Impervious: 1,200 ft2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:❑DOES* 0 DOES NOT Require a Permit <br /> Determination Made by: DAN ❑JDB JAS ❑JAH 0 JRT ❑AJM ❑JRR <br /> Type of Permit Required: ❑Erosion Control ❑Shoreland Erosion Control ❑Stormwater Management <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125'Long new access road/driveway❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: Project is not located in the shoreland zone and does not meet <br /> permitting criteria in Ch. 14.45 DCCO. <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size,scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.