|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00056
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 3:21:19 PM
Creation date
3/7/2017 3:07:41 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00056
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bartlett, Russell <br /> From: Neidhart,Jim <br /> Sent: Wednesday, March 01, 2017 3:25 PM <br /> To: Bartlett, Russell <br /> Cc: 'info @misnahomes.com' <br /> Subject: Land &Water Resources Permits <br /> Attachments: MLSNA Approved Plan.pdf <br /> Russ, <br /> Per our phone discussion,erosion control and stormwater permits are in place for the final phase of construction for the <br /> MLSNA Warehouse Site. This includes Building C, the office/shop, paving of drive aisles and the associated stormwater <br /> facilities and final restoration. <br /> For your reference,the permit numbers are EC2015-0256 and SM2015-0257. The erosion control permit is scheduled to <br /> expire on 9/15/2018. <br /> Also included is a copy of the plan, both for your reference and for Mr. MLSNA. <br /> Regards, <br /> Jim <br /> DANE f James Neidhart <br /> S3® Water Resource Engineering Division <br /> , 5201 Fen Oak Dr <br /> Madison,WI 53718 <br /> LAND&WATER 608-224-3738 <br /> RESOURCES <br /> DEPARTMENT https://wred-lwrd.countvofdane.com/ <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.