|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00042
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 3:16:28 PM
Creation date
3/7/2017 3:23:05 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00042
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need thiOA :*._, : <br /> 33' 33' <br /> I <br /> Front Setback area S 72°57'40" E 254.01' Side Setback area Rear <br /> %������i���/////%i ii,ii, i, i.�i.�� Setback <br /> CD ./JJJ area <br /> O O <br /> Needs a 10 Feet / w <br /> ® MUM! Location <br /> w W <br /> w �' <br /> 1 Survey ~Setback w <br /> ® O V� ] Proposed 169.8' Line 00 <br /> _a N 44 Q Addition .- O <br /> IX i•� 35. 2 7 is <br /> e c- <br /> Z <br /> I1ir4WVAWA <br /> u, <br /> ® r <br /> 1 Side Setback area N 72°57' 40" W <br /> 33' 33' I I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions.I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> 7,4,;s (7)/e 3/4 <br /> SIGNATURE: <br /> / Owner/Agent <br />
The URL can be used to link to this page
Your browser does not support the video tag.