Laserfiche WebLink
1 fencing goes halfway around the quarry it's <br /> 2 going to cost us $6,000. If there is some woven <br /> 3 fence that goes entirely around our quarry it <br /> 4 would be over $12,000. <br /> 5 Sloping and covering, which is a <br /> 6 reclamation procedure, and slopes the banks to a <br /> 7 one-to-one, if we have to bring fill in, we <br /> 8 can't do it in our daily operation, it would <br /> 9 cost us over a million dollars to slope the <br /> 10 banks for the size of the quarry that it's in. <br /> 11 That's just in the area that I'm asking for 600 <br /> 12 hundred additional feet, <br /> 13 That's a 100-foot high banks sloped 100 <br /> 14 feet out. That gives you one-to-one slope. <br /> 15 It' s a couple hundred thousand yards of material <br /> 16 that has to be moved in which we' re offering to <br /> 17 do, plus covering the ground with a foot of <br /> 18 tillable soil. <br /> 19 The reduced hours of operation, which I <br /> 20 was asked that we're going to do to control the <br /> 21 noise, has a large potential to cause us loss of <br /> 22 sales due to product availability. If we run <br /> 23 out of products and we can't crush nights we'll <br /> 24 be losing sales. It's that simple. And we're <br /> 25 offering not to run nights. <br /> 4 <br /> * * * CAPITOL CITY REPORTERS * * * <br />