Laserfiche WebLink
ti <br /> MADSEN <br /> CONSTRUCTION <br /> Statement of Intended Use <br /> Reiner Road Property <br /> The intended property usage is to consist of on-site storage and main- <br /> tenance of construction equipment, storage of construction materials , <br /> and a possible future office facility. (See attached sketch for possi- <br /> ble siting. ) <br /> Operation of the facility will generally be on a Monday-to-Friday <br /> basis with only occasional overtime. Entry is shown to the site from <br /> Reiner Road. A secondary entry would be possible via Maly Road off <br /> Nelson Road. <br /> Madsen Construction Company,Inc. P.O. Box 14410 Madison, Wisconsin 53714 608 241-7733 <br />