|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00073
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:24:52 PM
Creation date
3/10/2017 4:01:13 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00073
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 2/13/2017 <br /> Caller/Contact: Tim Foulker Phone#: (608) 575-3774 <br /> Landowner: (same) Phone#: <br /> Contact Email: timfoulker@hotmail.com <br /> Project Address: 6538 Schumacher Rd, Waunakee <br /> Location(Municipality): Tn. Vienna Section: 33 1/4: <br /> Parcel#: 0909-332-9700-8 <br /> Project Description: New 40' x 90' shed to replace one lost by fire. New shed will be <br /> built on slab and footings of old building, except for one footing to be replaced on north <br /> side of building. <br /> Planned Size of Disturbance: 300 ft2 Planned Size of New Impervious: 3600 ft2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:0 DOES* Q DOES NOT Require a Permit <br /> Determination Made by: DAN DJDB JAS DJAH DJRT DAJM DJRR <br /> Type of Permit Required: DErosion Control DShoreland Erosion Control DStormwater Management <br /> D Disturbance >4000 ft2 D Excavate/Fill>400 yds3 D Disturbing 100' of ditch/channel <br /> D125'Long new access road/driveway D Subdivision Plat/CSM 0 20,000 ft2 New Impervious areas <br /> DShoreland Zone Disturbance D Other: <br /> Basis for Determination: No EC triggers reached, no Shoreland Zone nearby. <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size,scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.