|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-03775 (2)
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-03775 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 10:35:49 AM
Creation date
3/14/2017 10:35:32 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
03775
AccelaLink
DCPREZ-0000-03775
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PETITION #3775 <br /> Item: 1) . Create a new Section 10.123 (2) (e) as follows: <br /> 10.123 (2) (e) Mineral Extraction subject to the following: <br /> 1) . Approval of the pertinent town board is required. <br /> 2) . Application, operation, etc. shall be pursuant to Section <br /> 10.12 (2) mineral extraction provisions. <br /> EXPLANATION: <br /> Twenty-seven towns have adopted A-1 Exclusive. Mineral extraction is not <br /> currently a permitted or conditional use in the A-1 Ex. District. Therefore, <br /> a change in zoning to a permitted district is required. This requirement <br /> causes a minimum of 3 months delay for some projects and is causing <br /> unnecessary hardship for contractors particulary when highway projects are <br /> involved. The amendment as proposed will provide for full regulation of <br /> mineral extraction without a zoning change being required. <br /> Submitted at the request of the Zoning Administrator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.