|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00484
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:18:27 PM
Creation date
3/14/2017 12:32:18 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00484
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> When you are ready to submit your Zoning Permit application, please make an appointment with me for <br /> review of the application materials (or send them to me for review first). Specifically, you and I must <br /> work together to assure compliance with minimum setbacks and yards, maximum lot coverage, and the <br /> list of requirements above before the Zoning Permit may be issued. <br /> Please feel free to contact me by email or phone if you have any questions. <br /> Sincerely, <br /> /l/,i s Sc - <br /> Kris Schutte <br /> Assistant Zoning Administrator <br /> Dane County Zoning Division <br /> Department of Planning and Development <br /> 608.266.9084 <br /> schutte @co.dane.wi.us <br /> ENCL. <br /> CC: <br /> Robert &Jacqueline Vejvoda, owners <br /> CC VIA Electronic Mail <br /> Roz Gausman, Clerk, Town of Dunn <br /> Renee Lauber, Land Use Manager, Town of Dunn <br /> Cami Peterson, Water Regulations Specialist, WDNR <br /> Jeremy Balousek, Erosion Control Engineer, Dane County Land &Water Resources Department <br /> Page 2 of 2 <br /> 210 Martin Luther King Jr.Blvd.❖Room 116,City-County Bldg.•Madison,WI 53703-3342❖Phone:608.266.4266❖Fax:608.267.1540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.