Laserfiche WebLink
�► i Dane County Planning and Development Department <br /> °4-4= Room 116,City-County Building,Madison,Wisconsin 53703 <br /> it Fax (608) 267-1540 <br /> Housing& <br /> Economic Development <br /> f.6 <br /> (608)266-4270,Rm.362 <br /> July 22, 2008 Planning <br /> (608)266-4251,Rm.116 <br /> Mr. Paul Young <br /> 102 Community Drive Records Support <br /> Fall River WI 53932 (608)266-4251,Rm. 116 <br /> Zoning <br /> NOTICE TO SUBMIT A LOCATION SURVEY (608)266-4266,Rm. 116 <br /> Location: 7151 Pfiel Lane,Lot 45,Winfield Estates Kalland Addition,Town of Bristol,Section 18 <br /> Parcel#: 012/0911-183-4055-0 <br /> Your zoning permit(#20080471)was issued with a condition requiring that a location survey be submitted <br /> to this office after the building's location was established,and before work continued. In your case,a <br /> location survey by a licensed surveyor is required to verify distance for the minimum required setback of <br /> 30.0 feet to the right-of-way line for Pfiel Lane and the minimum required setback of 10.0 feet to the north <br /> property line.Please submit this location survey by mail or hand-deliver to our office,attention to Russell L. <br /> Bartlett. It must reach me within two weeks of the date of this letter or a citation will be issued for each day <br /> of non-compliance. <br /> Continuation of work without submitting a location survey has constituted a violation of the zoning <br /> permit conditions and of the Dane County Code of Ordinances, Chapter 10.25 (see below), and may result <br /> in further enforcement actions. <br /> 10.01 (30m)Location survey, as indicated in this ordinance, refers to survey information prepared by a <br /> licensed surveyor indicating the location of property lines and building location distances from those <br /> property lines for the specific portions of the building indicated in this ordinance. Such surveys are not <br /> required to provide all the parcel information set forth by Wisconsin Administrative Code Chapter A-E 7.02 <br /> Minimum Standards for Property Surveys item A-E 7.01(2) but may exclude unnecessary information as <br /> permitted in A-E 7.01(2)and provide only the information required by the zoning ordinance but such <br /> information must comply with the accuracy standard required by A-E 7.06 Measurements. <br /> 10.25(3)(a) 1.A location survey as defined herein shall be submitted to the zoning division for all <br /> construction, which will be located less than 10'from required setback lines. The survey shall be done at <br /> the time when foundations or basement walls are completed, or when slab is poured. Such survey shall <br /> be submitted to the zoning office prior to the continuation of work on the project. <br /> Thank you for your cooperation, and I look forward to receiving the location survey. <br /> Sincerely, / <br /> Russell L. Bartlett,bartlett@co.dane.wi.us, 608-267-3960,Zoning Inspector, County of Dane v <br /> Enclosures: Copy ZP200804.7- /g, <br /> ***NOTICE TO APPLICANT*** <br /> Return envelope <br />