Laserfiche WebLink
Page 2, Petition 11074 <br /> Described As Follows: Commencing at the East 1/4 Corner of said Section; <br /> thence S.89°58'36"W. along the East-West Centerline of said Section, 832.03 <br /> feet to the place of beginning for the land to be herein described; thence <br /> S.0°06'12"W. 433.0 feet; thence N.89°58'36"E. 70.64 feet; thence S.0°06'12"W. <br /> 319.10 feet; thence N.89°58'36"E. 686.53 feet to the relocated West Line of <br /> S.T.H. "73"; thence S.0°39'08"W. along said West Line, 570.87 feet to the South <br /> Line of the NE 1/4 of the SE 1/4 of said Section; thence N.89°54'44"W. along <br /> said South Line, 1258.77 feet to the West Line of the NE 1/4 of the SE 1/4 of <br /> Section; thence N.0°50'18"E. along West Line, 1320.64 feet to said East-West <br /> Centerline; thence N.89°58'36"E. along said East-West Centerline, 490.15 feet to <br /> the place of beginning. <br /> R-1 A to RH-2 <br /> Lot 1 of a Certified Survey Map No. 11436, recorded in Volume 69, Pages 250 <br /> thru 252 of Certified Survey Maps of Dane County, Wisconsin, as Document No. <br /> 4072405 and located in the NE 1/4 of the SE 1/4 of Section 22, T. 5N., R.12E. of <br /> the 4th P.M., Town of Albion, Dane County, Wisconsin. <br /> CONDITIONAL ZONING <br /> Conditional zoning is hereby imposed pursuant to Section 10.255(3)(a)2.(b) of the <br /> Dane County Code of Ordinances. The rezoned area shall be subject to the <br /> following conditions. <br /> CERTIFIED SURVEY REQUIRED <br /> The above listed description/s is/are intended to describe land for which a certified <br /> survey map will be prepared for approval and recorded. Within 90 days of rezoning <br /> approval by Dane County, a final certified survey map that describes the land to be <br /> rezoned shall be prepared in accordance with all applicable provisions of Chapter <br /> 236 Wisconsin Statutes and Chapter 75 Dane County Code of Ordinances, and <br /> submitted to the Dane County Zoning Division. Upon submission of the final <br /> certified survey map, the Zoning and Land Regulation Committee, or its authorized <br /> representative, shall, within 30 days, approve, approve conditionally, or reject the <br /> certified survey map. Failure to submit the final certified survey within the 90 <br /> day period and/or failure to record the survey with the Dane County Register <br /> of Deeds will cause the rezone to be null and void. Two copies of the <br /> recorded survey shall be submitted to Dane County Zoning. <br />