Laserfiche WebLink
DANE COUNTY HIGHWAY & TRANSPORTATION DEPARTMENT E S T I M A T E <br /> 2302 Fish Hatchery Road <br /> Madison, Wisconsin 53713 PAGE 1 OF 1 <br /> PROJECT NO. XXX-XXXX AGENCY: Dane County <br /> TYPE OF WORK: Pavement Widening for Turning Lane Construction <br /> LOCATION: CTH "M" & "S" - Middleton Junction (Menard Ent) <br /> CALCULATED BY: JO'C CHECKED BY: DLN DATE: 3-19-87 <br /> ITEM QUANTITY UNIT RATE AMOUNT <br /> Excavation 2400 C.Y. 4.00 9,600.00 <br /> Corr. Metal Pipe Arch - 57" x 38" 140 L.F . 75.00 10, 500.00 <br /> Struc. Plate Pipe Arch - 73" x 55" 48 L.F. 110.00 5,280.00 <br /> Endwalls - 64" x 43" 2 Each 500.00 1 ,000.00 <br /> Endwalls - 73" x 55" 1 L.S. 6000.00 6,000.00 <br /> Concrete Curb & Gutter - 30" 515 L.F. 10. 00 5, 150.00 <br /> Const. Inlet & 120'-12" Storm Sewer 1 L.S. 3100.00 3, 100.00 <br /> Grinding - Wedge & Butt Cuts 1200 S.Y. 1 .50 1 , 800.00 <br /> Base Course & Shouldering 1050 C.Y. 15.00 15, 750.00 <br /> Bituminous Concrete Pavement 1800 Ton 25.00 45,000.00 <br /> Salvaged Topsoil , Seeding, etc. 7500 S.Y. 0.50 3,750.00 <br /> Misc. (Painting, etc. ) 1 L.S. 3000.00 3,000.00 <br /> Sub-Total $109,930.00 <br /> C: +/- 15 Contingencies 16,570.00 <br /> (:) P <br /> TOTAL $126,500. 00 <br /> APR 0 2 , , <br />