|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00480
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:17:56 PM
Creation date
3/16/2017 11:37:33 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00480
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JEFF MURRAY Page 2 12/13/2007 <br /> • <br /> • Comm 61.36(1)(a)&(b) This approval will expire 2 years after the date of this letter if the building shell is not <br /> closed in within those 2 years. Also,this approval will expire 3 years after the date of this letter if the work <br /> covered by this approval is not completed and the building ready for occupancy within those 3 years. <br /> A copy of the approved plans, specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors.If plan index sheets <br /> were submitted in lieu of additional full plansets,a copy of this approval letter and index sheet shall be attached to <br /> plans that correspond with the copy on file with the Department.All permits required by the state or the local <br /> municipality shall be obtained prior to commencement of construction/installation/operation. <br /> If this construction project will disturb one or more acres of land,an Erosion Control Notice of Intent(NOI)shall be <br /> filed with the department 7 days prior to any earth disturbing activities.You will need to either file the NOI and an <br /> erosion control plan summary on-line at www.commerce.wi.gov/sb or submit a completed NOI form and either a <br /> plan summary or complete plan to us,with additional fees,or to the certified municipality. <br /> In granting this approval the Division of Safety&Buildings reserves the right to require changes or additions should <br /> conditions arise making them necessary for code compliance.As per state stats 101.12(2),nothing in this review <br /> shall relieve the designer of the responsibility for designing a safe building,structure,or component. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below,or at the address <br /> on this letterhead. <br /> Sincerely, Fee Required$ 390.00 <br /> �.'� This Amount Will Be Invoiced. <br /> When You Receive That Invoice, <br /> Jon Molzahn Please Include a Copy With Your <br /> Plan Reviewer,Integrated Services Payment Submittal. <br /> (608)785-9344, Fax: (608)785-9330,Mon-Fri, 7:45 am-4:30 pm WiSMART code:7648 <br /> jon.molzahn@wisconsin.gov <br /> cc: Steve Gothard, State Building Inspector, (608)235-0568,Monday <br /> Jeffrey T Levake,Levake Soil Testing <br /> Louise Ewald (Plans Mailed To) <br /> Proposed Rules: The Wisconsin Division of Safety&Buildings is in the process of adopting the 2006 International <br /> Code Council suite of building codes, including the International Existing Buildings Code,with a likely effective <br /> date of March 1,2008. You may view or download the adopted draft of chs. Comm 61-65 at <br /> www.commerce.wi.gov/SB/SB-CodeDevelopment.html <br />
The URL can be used to link to this page
Your browser does not support the video tag.