Laserfiche WebLink
r <br /> 2/21/2017 <br /> CL tAll <br /> P.O Box 930220 ENDRES,RUSS <br /> Verona,WI 53593-0220 Doc ID:3883820170221140143 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> • <br /> Project Colors <br /> Building <br /> Siding <br /> Grand Rib 3 Plus: Red <br /> Corner Trim:Snow <br /> Bottom Trim:Snow <br /> Roof <br /> Grand Rib 3 Plus:Snow <br /> Split Gable <br /> Splice trim for Split Gable:Snow <br /> Trim <br /> Gable:Snow <br /> Eave/Fascia:Snow <br /> Ridge Cap:Snow <br /> Trim Color Unless Otherwise Specified:Snow <br /> Overhead Frameouts <br /> Overhead Frameout <br /> J-Trim:Snow <br /> Truss Type <br /> J-°-218 TREATED Ptpf� <br /> FINSHED r4'''--- y.--(0tUA1N <br /> :,_1CP hf <br /> t I�s--- :tsrr -- <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 3.5/12 <br /> �,//' - Roof Peak Height: 22' 1" <br /> - --, "— — "A" =Actual Eave Height: 13'4" <br /> Ii "B" = Truss clearance at heel and center: 12'0" <br /> Q m i I, CO (Truss clearance = 1-0" less than nominal eave height, in most cases. <br /> \ I r100'+0. If nested purlins are used,truss clearance will be increased by 4") <br /> Standard Lower Chord Truss (SLC) <br /> Overhead Frameout & Headroom <br /> • <br /> C-500 <br /> v12/10 built with pride before the is applied ® 9 of 16 <br /> 0, <br />