|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02362
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 11:36:14 AM
Creation date
3/27/2017 11:27:28 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02362
Town
Burke Township
Section Numbers
26
AccelaLink
DCPCUP-2016-02362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br /> .; r ,'g DANE COUNTY <br /> PLANNING ',DEVELOPMENT <br /> 'le--,-9 is i $1' <br /> / <br /> 't,\? 0.839 ;S !, Room 116, City-County Building, Madison, Wisconsin 53703 <br /> ,,'a QO23 ~1=- Fax (608)267-1540 <br /> Housing& <br /> Economic <br /> TO: Bill Ziegler Development <br /> Madison Crushing & Excavating (608)266-4270,Rm.362 <br /> FROM: Dan Everson, AssistanfiZoning Adm. Plan 4 <br /> (608)266 66-4251,Rm.116 <br /> DATE: November 7, 2016 Records&Support <br /> (608)266-4251,Rm.116 <br /> RE: Conditional use permit - Mineral extraction <br /> Zoning <br /> (608)266-4266,Rm.116 <br /> Dear Mr. Ziegler, <br /> This letter serves as notice that your application to renew and expand the current mineral extraction <br /> activities is incomplete. Staff has reviewed your application and the following items need to be <br /> addressed as soon as possible in order to adequately prepare a staff report prior to the Dane County <br /> Public Hearing: <br /> • A complete metes and bounds legal description, describing the entire area devoted to mineral <br /> extraction purposes as well as any expanded areas. The legal description that was submitted <br /> only describes the existing CUP areas. <br /> • A detailed map, drawn to scale that coincides with the areas described within the legal <br /> description. <br /> • An operational plan that shows the following details: Location of the existing highwalls, direction <br /> of extraction (phasing), haul routes, storage areas, weigh station, any detention areas. <br /> o Scaled drawing of the property showing existing/proposed buildings, setback <br /> requirements, driveway, parking area, outside storage areas, location/type of exterior <br /> lighting, any natural features, and proposed signs. <br /> • A plan map showing the entire activity area and the surrounding neighboring properties. <br /> The information described above will need to be submitted no later than November 11, 2016: If the <br /> information is not received by this date, the public hearing may need to be changed to December 13th or <br /> January 24th in order to allow sufficient time to review a complete application. Also, the existing <br /> reclamation plan on file may need to be amended if the new application is approved to allow for the <br /> expanded areas. <br /> In addition, all mineral extraction operations conducted under CUP 1672 and CUP 1993 are to be <br /> suspended until the town of.Burke and Dane County have taken action on the new conditional use permit <br /> application. Both CUP's are considered null and void. <br /> Please contact me directly if you have any questions with this letter or if I am not available, please <br /> contact Zoning Administrator Roger Lane at 266-9078. <br /> Sincerely, <br /> a( rot <br /> 'Dan Everson <br /> Assistant Zoning Administrator <br /> 267-1541 <br /> CC: <br />
The URL can be used to link to this page
Your browser does not support the video tag.