|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02362
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 11:36:14 AM
Creation date
3/27/2017 11:27:28 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02362
Town
Burke Township
Section Numbers
26
AccelaLink
DCPCUP-2016-02362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> BELKEN Engineering,Inc. <br /> • 1840 Essex Drive <br /> Sun Prairie,WI 53590 <br /> • Phone 608-837-0976 <br /> Cell Phone 608-225-7180 <br /> • E-mail:jbelken@;charter.net <br /> • <br /> BELKEN Engineering, Inc. <br /> Conditional Use Permit Application <br /> Madison Crushing and Excavation <br /> Northern Expansion(Expired CUP#1993) <br /> South Pit Area(Expired CUP#1672) <br /> Town of Burke <br /> This application provides information for two Conditional Use Permits(CUPs)for Madison Crushing and <br /> Excavation. The facilities consist of three areas.A legal non-conforming area is grandfather as an operating <br /> quarry. The portion of the property north of the non-conforming area will be referenced as the northern <br /> expansion area, and the portion of the property south of the non-conforming area will be referenced as the south <br /> pit area. New CUPs are required for northern expansion and south pit areas. The following information is <br /> appropriate for each CUP. Where information is required for the site specific CUP the information is identified <br /> as the northern expansion area or south pit area for the specific CUP application. The CUPs will allow for the <br /> contiguous operations of Madison Crushing and Excavation,Inc. for continued mineral extraction at the facility. <br /> Currently both CUP#1993 (Northern Expansion Area)and#1672 (south Pit Area)expired earlier in 2016. <br /> Operations have taken place on the non-conforming area since their expiration. The following provides <br /> information for approval of the CUPs. Information to address specific submittal requirements is indicted. Some <br /> information submitted results in duplication to address the specific submittal requirements. <br /> o Hours of Operation <br /> The hours of operation of the quarry are currently and will remain 6:00 am—7:00 pm Monday <br /> through Friday, excluding blasting,which may occur from 7:00 am through 7:00 pm. Saturday <br /> operations are currently and shall remain 6:00 am through 12:00 noon with blasting permitted from <br /> 7:00 am— 12:00 noon. No operations occur on Sundays or legal holidays,except snow plowing <br /> activities,which include hauling and disposal of snow. <br /> o Number of Employees <br /> The current number of employees at the quarry is 50. This number may vary with market conditions, <br /> but is not expected to vary significantly.. <br /> o Anticipated Customers <br /> Anticipated customers include,but not limited to contractors,builders,private homeowners, <br /> municipalities and others whom require crushed aggregates for construction projects. <br /> o Outside Storage <br /> Aggregate and overburden material are stored on-site in stockpiles. The active mining areas are <br /> screened from viewing by the general public. Equipment is stored and parked at designated locates <br /> on-site. <br /> o Outdoor Activities <br /> Outdoor activities are consistent with mining activities, including but not limited to blasting, crushing, <br /> screening and transporting material on-site and to project locations. <br /> o Outdoor Lighting <br /> Providing Consulting <br /> Engineering Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.