|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02362
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 11:36:14 AM
Creation date
3/27/2017 11:27:28 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02362
Town
Burke Township
Section Numbers
26
AccelaLink
DCPCUP-2016-02362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
graders, front-end loaders,back hoes, haul trucks, conveyors, screening equipment, scales,general <br /> site maintenance equipment. Frequency will depend on market demand. All operations will occur <br /> during normal operating hours. <br /> k. Frequency of blasting,drilling,mining,crushing, screening, washing,refueling. <br /> All of the above activities may be performed during the mining operations. Blasting, if performed <br /> will be done in accordance will appropriate regulations. <br /> 1. Bulk fuel storage. <br /> There are two(2) 10,000-gallon and one(1) 1,000-gallon bulk storage fuel tanks on site. Secondary <br /> containment is provided. Guard posts are provided around the tank area. <br /> m. Asphalt batching or concrete mixing. <br /> The facility does not provide asphalt batching or concrete mixing at this location. <br /> n. Proposed storage of recycled materials. <br /> Recycled concrete is stored on-site for use in projects and/or site reclamation areas. <br /> o. Does extraction occur below the water/protection of groundwater. <br /> Extraction does not occur below groundwater elevations. Storm water collection areas are a <br /> minimum of five feet above groundwater elevations. <br /> p. Permanent or temporary structures. <br /> Non-conforming Area-Permanent structures include an office building housing administrative offices <br /> and equipment maintenance/storage building,scale facilities and fuel storage tanks,as well outside <br /> storage yard area for equipment and employee parking. See attached drawings. <br /> South Pit Area—A house is located on the east side of the area and rented out by the owner. The <br /> remainder of the South Pit area is used for processing and stockpiling material. See attached <br /> drawings. <br /> q. Spill prevention and or dust control. <br /> The operator will take whatever measures are available for spill prevention and control,dust control, <br /> transportation, or environmental protection. <br /> r. Proposed use after final reclamation as consistent with Ch 74 Separate checklist for reclamation permit. <br /> The proposed use after operations will be consistent with Chapter 74. <br /> A reclamation plan has been prepared for the site. Final use is anticipated to be for the expansion area <br /> is open space. <br /> ATTACHMENT B <br /> Submittal Requirements for a CUP for Mineral Extraction <br /> The following are responses to Dane County Ordinance Section 10.191 Procedures of Operation For Mineral <br /> Extraction Operations. <br /> (2)(a)Legal Description <br /> 1. Description of Property and Location <br /> Mineral Extraction Boundary Map Description: <br /> Conditional Use Permit—Mineral Extraction Updated December 9,2016 NE 1/4 of the NE 1/4 Sec..26.T8N,RI OE <br /> Madison Crushing&Excavating.,Inc. Page 7 Town of Burke,Dane County,\VI <br />
The URL can be used to link to this page
Your browser does not support the video tag.