Laserfiche WebLink
consisting of till, outwash, and glacial lake sediments cover the area,often to a thickness of <br /> several hundred feet. Bedrock consists of Cambrian sandstones overlain in some areas by <br /> Ordovician dolomites. Precambrian bedrock lies under the sandstone at depths of greater than <br /> 500 feet. Cambrian sandstone of the St. Peter Group underlies the dolomite. <br /> The WGNHS indicates quarry operations are mostly bedrock of the St. Peter Sandstone and the <br /> Prairie du Chien group consisting mostly of dolomite. The WGNHS indicates thicknesses up to <br /> 350 and 250 feet, respectively. <br /> Wisconsin Geologic and Natural History Survey(WGNHS)Report#HA-360 gives an overview <br /> of the regional groundwater regime. Depth to groundwater in the area of the mining operation is <br /> typically less than 150 feet according to the WGNHS report. This is supported by mining <br /> operations, with depths of approximately 70 feet and not encountering ground water. <br /> Groundwater moves away from high points on the potentiometric surface and discharges into <br /> lakes, streams,wetlands and areas of pumpage. Flow paths are short. <br /> The mining operation will be conducted above the groundwater table with a buffer of at least 5 <br /> feet. <br /> 4. Types and quantities of materials that will be extracted. <br /> Sand and gravel material is derived from crushed limestone bedrock. The CUPs will allow <br /> extraction of materials at this site as well as production stockpiles.The limestone will be mined <br /> until the area extends to the limits of the CUP area. <br /> Hardpan and other unsuitable material encountered during the mining operation, along with <br /> clean uncontaminated fill, are stockpiled to provide a source of backfill material during final <br /> reclamation activities. <br /> 5. Proposed dates to begin extraction,end extraction and complete reclamation. <br /> Initial extraction began in 1989. CUP petrttits have been renewed to continue mineral <br /> extraction. Rate of extraction is dependent on demand and market conditions. After mineral <br /> extraction the site will be graded and restored as open space.A reclamation plan has been <br /> prepared and will be followed. Extraction period is for 90 years.Attached drawings indicate the <br /> general contours anticipated during the restoration process. <br /> 6. Proposed hours and days of operation. <br /> Hours of operation shall be as follows: <br /> a. Operations,excluding blasting,may begin at 6:00 am Monday-Saturday. <br /> b.Blasting may begin at 7:00 am Monday-Saturday. i, t <br /> c.Drilling,blasting and crushing shall cease at 7:00 pm Monday-Friday and at 12:00 noon on --1r <br /> Satarday. <br /> d. Equipment and vehicles not involved in quarry operations may enter and leave the site outside t" i <br /> of the stated hours of operations. Non-quarrying supplies and equipment may be loaded and <br /> unloaded from vehicles;and equipment and vehicles may be repaired and maintained outside the <br /> stated hours of operation. Some equipment warm up and cool down time may also be allowed. <br /> 7. Geologic composition and depth of the mineral extraction. <br /> Based on existing mining operations, anticipated depth of limestone extraction is up to 100 feet. <br /> 8. Identify all major proposed haul routes to the nearest Class A highway or truck route. Indicate <br /> traffic flow patterns. <br /> Conditional Use Permit—Mineral Extraction Updated December 9,2016 NE 1/4 of the NE 1/4 Sec..26,T8N,RIOE <br /> Madison Crushing&Excavating.,Inc. Page 10 Toscn of Burke,Dane County,WI <br />