Laserfiche WebLink
Proposed Use of Property: <br /> TOWN OF MIDDLETON HEADEND <br /> Three twelve-foot satellite antennas will be located as <br /> shown in positions 1 , 2, and 3 on the attached drawings. <br /> Antennas will be white fiberglass construction with dark <br /> blue steel mounting hardware. A foundation sketch is also <br /> attached. <br /> The electronic equipment will be located in a 16 ft. by 16 <br /> ft . room to be constructed inside the old haymow area of <br /> the barn. The only part of the facility visible from <br /> outside the barn will be a window air conditioner mounted <br /> in a hole in the barn wall. Off-air antennas will hang <br /> from the ceiling inside the barn. No water or septic tank <br /> will be required. <br /> Estimated cost of construction is $7000. <br /> Estimated cost of facility including antennas and <br /> electronics is $31 ,000. <br /> MIDLHED4 <br />