|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00095
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 12:52:26 PM
Creation date
3/28/2017 12:52:01 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00095
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 3/16/2017 MATTKE,JIM OR CL' ARY Verona,WI 53593-0220 Doc ID:51298201 033 6116 346 <br /> BUILDING CORP. Phone:(608) 845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Contingencies <br /> Contract contingent on Permit. If building contingency is not approved, Purchaser to receive down payment of$2010 back <br /> in full. Approval is expected by 4/1/17 <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation (B.E.)of overhead door: 0'4" <br /> The bottom of all overhead doors (top of finished floor)are <br /> '-.;14011111. recommended to be placed at 4"above the 100'-0" mark(100'-4"). In <br /> i building without paved floors, B.E.of doors may be lower-e.g. 100'- <br /> TRUSS 0„ <br /> II ,( "E" = Height of overhead door: 8'0" <br /> i�__.i Overhead door height = the height of the overhead door being placed <br /> I in this building. <br /> 1 <br /> Li' I "F" = Available headroom: 0'8" <br /> F°c ► <br /> 1 Available headroom =the space available for overhead door tracks <br /> I t`'NI and openers. If a ceiling is installed, headroom will be reduced by <br /> _ about 1". Door headroom requirements must be confirmed with the <br /> g. I TOR OF FR4IS►(p 5 W door supplier. <br /> I FLOOR <br /> t $ Headroom calculation formula: <br /> 100'+0' . <br /> z.I i ed („B„)-(.D„)- („E„) = ("F”) <br /> ' `.. (Truss Clearance)-(B.E.of overhead door)-(Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0")-(4")-(8'-0") = (1'-8" of available headroom) <br /> Payment Terms <br /> Amount Type Percent Description <br /> $2,010 Down Payment 20% Upon the signing of the contract with CLEARY BUILDING CORP. <br /> $4,020 Delivery Payment 40% Payment due upon first load of building materials. In the event that <br /> multiple loads of materials are required, due to the size of the building,the <br /> remaining materials will be shipped to the site as needed while the building <br /> is under construction <br /> $4,020 Final Payment 40% Paid upon Completion and such payment to be delivered to the crew <br /> foreman of CLEARY BUILDING CORP. <br /> $10,050 Contract Amount 100% <br /> TERMS OF PAYMENT:(1)If Contract Amount is$25,000.00 or less,the terms of payment shall be as provided in the payment <br /> terms section above.(2)If Contract Amount is over$25,000.00,the terms of payment shall be pursuant to the Bank Reference <br /> C-500 <br /> 0 built with pride before the Oil\ is applied ® 13 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.