Laserfiche WebLink
/O� a 01 pN\\11�ti� <br /> rt Dane County Planning & Development <br /> " �� '� -� Room 116, City-County Building, Madison, Wisconsin 53709 Land Division Review <br /> ',4iscID4 ---- 608/266-9086 <br /> ‘v,...„-----'' Property Listing <br /> 608/266-4120 <br /> NOTICE OF FAILURE TO SUBMIT A LOCATION SURVEYSurveyor <br /> 608/266-4252 <br /> Zoning <br /> 608/266-4266 <br /> Name: Mark Jurovic Date:5/04/99 <br /> Address: 2827 Shadow Trail <br /> Sun Prairie WI 53590 <br /> Location :29 Bristol,Lot 10 Sunset Ridge,2827 Shadow Tr,Par#091129262807, Screen porch <br /> add'n to SFR. <br /> When your zoning permit (ZP 1998 1827)was issued a condition was placed upon it <br /> requiring that a location survey be submitted to this office after the building's <br /> location was established and before work continued. <br /> If you have already had a surveyor prepare a location survey, please send a copy to <br /> our office with a copy of this letter. <br /> If you have not obtained a survey, this notice serves as a STOP WORK ORDER. <br /> You may not continue building until a survey has been received by this office. <br /> Continuation of building without having submitted a location survey constitutes a <br /> violation of the zoning permit conditions and of the Dane County Code of Ordinances, <br /> Chaper 10.25 (see below). Further enforcement actions may result. <br /> Your deadline for submitting the location survey is: May 21, 1999 . <br /> (30m) Location survey. As indicated in this ordinance refers to survey information prepared by a licensed surveyor <br /> indicating the location of property lines and building location distances from those property lines for the specific portions of <br /> the building indicated in this ordinance. Such surveys are not required to provide all the parcel information set forth by <br /> Wisconsin Administrative Code Chapter A-# 7.02 Minimum Standards for Property Surveys item A-E 7.01 (2) but may <br /> exclude unnecessary information as permitted in A-E 7.01 (2) and provide only the information required by the zoning <br /> ordinance but such information must comply with the accuracy standard required by A-E 7.06 Measurements. <br /> (a) Location Survey <br /> A location survey as defined herein shall be submitted to the zoning division for all construction which will be located less <br /> than 10' from required setback lines. The survey shall be done at the time when foundations or basement walls are <br /> comple sury y sh�sub ed to the zoning office prior to the continuation of work on the project. <br /> J r; Z <br /> Patrick D Anderson-Zoning 1 •: or-266-9085 <br />