|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00080
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 4:07:39 PM
Creation date
4/5/2017 4:07:37 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00080
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LONDON LUMBER. <br /> ICON N.INC. <br /> • 34 Depot Road,Cambridge,WI 53523 Jeff&John <br /> PHONES-Deerfield 608-764-5222 or Cambridge 608-423-3316 <br /> LONDON,WISCONSIN 53523 <br /> September 21, 2016 <br /> Jim Schmidt <br /> 1788 Leon Lane <br /> Deerfield, WI 535331 <br /> Quote for 44' x 72' Pole Shed with approximately 23' sidewall. 1 Z at) , <br /> Building to be built around a old stone foundation. <br /> 2 x 8 3-ply laminated poles 8' on center. <br /> Trusses 8' on center. , t <br /> 2 - 12' x 12' split sliding doors. Lkifr-f•l D S <br /> x 72' Porch, with lean to on one side. C44 )cL3d/ . <br /> •verhang on all four sides of building. <br /> 54- uminum fascia and sofft. <br /> No stairway figured. $ 53,550.00 <br /> Quote for a new floor in pole shed. <br /> 2 x 12 floor joist 16" on center. '7 <br /> 2 - LVL Beams with 6 x 6 post ever 9' on center. Lbc"'7r''n — /21 '`"wt' <br /> 2 x 10's treated for floor joist in porch with lean to. <br /> 5/4 x 6 treated deck boards on porch. $ 20,970.00 <br /> Quote ofr a 3/4" Tongue and Groove plywood <br /> floor installed. $ 11,200.00 <br /> No Disposal included. <br /> No permits included. <br /> Quote good for 20 days. <br /> Upon agreement of the above bid, the first payment of half is due when the above bid <br /> job is accepted, and final payment is due when job is complete. When notified of <br /> approximate date to start it will be in your best interest to contact your insurance <br /> agent to get insurance for a new construction project. <br /> a <br /> Thank You, <br /> • ondon Lumber & Construction, Inc. <br /> John Frey <br />
The URL can be used to link to this page
Your browser does not support the video tag.