Laserfiche WebLink
ANCHOR TRENCH DETAIL <br /> TRENCH APPROX. <br /> BLANKET OVERLAP, <br /> 10'WIDE x 8'DEEP ��' <br /> 2-4 FLOW <br /> 4Y/V?�? �■?_��?.., \ /�/✓/ 1%.4' 1 ROW OF <br /> wfv w Yl�� SOIL PILE <br /> %i L ^, STAPLES• <br /> i k r7/ FROM TRENCH ;\ "� <br /> STAPLES ARE THROUGH 2 ROWS OF <br /> BOTH BLANKETS. J STAPLES <br /> J STEP 1 2 ROWS OF <br /> STAPLES,4'SPACING <br /> :ETWEEN ROWS,12' <br /> 6'OVERLAP FLOW SPACING BETWEEN---\ STAPLES <br /> / FLOW -�i 77-:1.�/W' '''\/9,7/ /'; <br /> •/�/♦\/\♦/\♦/\\/\• A . ■S. ♦\.%,., • <br /> 2 ROWS OF STAPLES STEP 2 <br /> 4'APART <br /> O� n <br /> 6,0-1," <br /> \� <br /> CHANNEL TERMINATION �) n�0�A n <br /> Ali <br /> STAPLES O —)6"APART OFFSET BY 3' tomAll4P- --- Q� <br /> w ( I• 1I '— <br /> --I I <br /> =I 11=1 I I =1 i I=1 11=' <br /> -�I I_ 11 1 1:1---.1 1 1 I , <br /> MATERIAL NOTES INSPECTION&MAINTENANCE NOTES <br /> 1. CHANNEL PROTECTION MEASURES MUST BE PREPARED OR REVIEWED BY AN 1. MAT SHALL BE INSPECTED WEEKLY AND WITHIN 24 HOURS AFTER EVERY <br /> ENGINEER TO DETERMINE CORRECT PRODUCT APPLICATION FOR SITE PRECIPITATION EVENT THAT PRODUCES 0.5 INCHES OF RAIN OR MORE DURING A 24 <br /> CONDITIONS. HOUR PERIOD. <br /> 2. ONLY PRODUCTS LISTED IN THE WISCONSIN DEPARTMENT OF TRANSPORTATION 2. INSTALL ADDITIONAL ANCHORING IN AREAS OF OBSERVED RILLING AND <br /> EROSION CONTROL PRODUCT ACCEPTABILITY LIST(PAL)ARE ACCEPTABLE FOR CONCENTRATED RENT VEGETATION BENEATH EROSION MAT, ENOUGH <br /> MAT,REGRADE, <br /> USE. <br /> COMPACT,RE-SEED,AND REPLACE THE SECTION OF MAT, <br /> 3. STAPLE MATERIALS SHALL BE PER THE MANUFACTURERS RECOMMENDATIONS. <br /> 3. IF PRODUCTS WITH PLASTIC NETTING ARE USED,REMOVE NETTING OR REPLACE MAT <br /> INSTALLATION NOTES IF SEPARATION OF THE NETTING FROM THE MAT IS OBSERVED. <br /> 4. ALL MAINTENANCE ACTIVITIES SHOULD OCCUR AS SOON AS POSSIBLE WITH <br /> 1. INSTALLATION SHALL CONFORM WITH WDNR CONSERVATION PRACTICE CONSIDERATION OF SITE CONDITIONS. <br /> STANDARD 1053,MINNESOTA STANDARD SPECIFICATIONS FOR CONSTRUCTION <br /> #2575,OR MICHIGAN STANDARD SPECIFICATIONS FOR CONSTRUCTION#816. <br /> 2. ALL PRODUCTS SHALL BE INSTALLED PER THE MANUFACTURER'S <br /> RECOMMENDATIONS,INCLUDING REQUIRED STAPLE SPACING AND PATTERNS. <br /> THIS STANDARD DETAIL IS AN EXAMPLE OF TYPICAL INSTALLATION GUIDANCE. <br /> 3. MATS SHALL EXTEND UPSLOPE 1-FT VERTICALLY FROM THE DITCH BOTTOM OR 6 <br /> INCHES HIGHER THAN THE DESIGN FLOW DEPTH,WHICHEVER IS GREATER. <br /> 4. MATS SHALL BE IN FIRM AND CONTINUOUS CONTACT WITH THE SOIL. <br /> 5. WHEN POSSIBLE,AVOID PLACING SIDE-BY-SIDE LAP JOINTS IN THE BOTTOM <br /> OF CHANNELS. <br /> DRAW. OAS <br /> NS 06/111/02 EROSION MAT-CHANNELS <br /> aaao:D; DATE <br /> µ OM NI <br /> APPROVED. DATE xmOICwn•AURHROACONNIne STANDARD EROSION CONTROL DETAIL <br /> Nm OSNIAY <br /> REV M7E DESCRIPTION <br /> CH/CD *PRO M SCALE: =NTS ' STANDARDS T OHD MSC 023.000 v00 <br /> iNAD D JfTBFORT1E DE OFAMERC A TRANSMISSION COT, KY.NBi1W�TDM4 Mg91ONCOMiMNYOIBCWMB ALL WARRANTIES BOTH EIPRESBMO MVUW USE BY ANYONE OTHER OLIN AMERICAN TRANSMISSION COMPANY IS AT TICBR OWN N9( OUMEfaC N TRAWMISSTON COMPANY <br /> ...\dms02355\T-OHD-MSC-023.000.dgn 6/1/2009 8:12:35 AM <br />