|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2017-00003
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPFLO-2017-00003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 3:36:19 PM
Creation date
4/7/2017 3:32:18 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2017-00003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WOOD STATE WOOD SINCE <br /> R STRAW WATTLE I <br /> rr,H _ STRAW WATTLE I ` R_ PROPRIETARY MATERML8 <br /> SEDIMENT PNWJER � ER08XIN MAT(DETAILEC3)TOP OP OVERFLOW - - a. lUPELOPE-E]OEI1'MIN,SUR PROTECTION II 1 1! 0- UPSLOPE OFPEDEIENT BARRIER <br /> I 4,,1 (ERN MTTYP.)TO FLOWDRET10N PLOW OIRECTXIN II r ETIENOI'MIN.FROM ��ED PRACTI LEROSipJ CONTI' SEDMTBARRER T� . PRACT10E8ORESUBHED III �```;�: ,.r HAS VEOETAIHTIN i <br /> v?'moo SURFACE <br /> ZV 1'• CUT EJDBTINO CUT EXISTING SURFACE <br /> Y VEOETATDN MERE N VEGETATION WHERE <br /> �++' PLACING TBARRI PERIMETER T VEGET TION WHERE <br /> SEDIMENT BARRIER SEDIMENT BARRIER <br /> STAKE DETAIL-PLACED OVER EXISTING VEGETATION STAKE DETAIL-TRENCHED IN <br /> .....) <br /> II'I j�l,r∎Ali l �'I r) PERIMETER BARRIER' Q1v��N0� DISTURBED AREA f/ <br /> ,1' \I <br /> 1 I ��„rll'N'.. Z0.C.TYP. <br /> ���' ��� � �� ���� iI � II rIII,B'V III OVERFLOW SCOU y. ���� � ( <br /> _ PROTECTION <br /> I\ � AI. <br /> till% � ■,ED TIE ENDS INTO SLOPE i yrillit,. ti 0 1 i i ' ' , i 1 r Ili,,,II,, .;-,,,,., ,,, <br /> 11 1 <br /> I it Fi■ <br /> I 1:11 \) 11‘2110\1 <br /> MATERIAL NOTES ESTABLISHED <br /> VEGETATION <br /> 1. PERIMETER SEDIMENT BARRIER PRACTICES SHALL CONSIST OF STRAW WATTLES,EARTHEN <br /> BERMS WITH STABILIZED FLOW DISTRIBUTING OVERFLOW OUTLET,STRAW BALES,OR OTHER INSPECTION&MAINTENANCE NOTES <br /> PROPRIETARY PRODUCTS. <br /> 2. EROSION MAT SHALL BE SELECTED AND INSTALLED PER THE REQUIREMENTS LISTED IN 1. PERIMETER SEDIMENT CONTROL PRACTICES SHALL BE INSPECTED <br /> STANDARD DETAIL T-OHD-MSC-022. WEEKLY AND WITHIN 24 HOURS AFTER EVERY PRECIPITATION EVENT <br /> THAT PRODUCES 0.5 INCHES OF RAIN OR MORE DURING A24 HOUR <br /> 3. WOOD STAKES SHALL BE AIR OR KILN DRIED HICKORY OR OAK WITH THE FOLLOWING PERIOD. <br /> DIMENSIONS: <br /> 118”X118"X REQUIRED LENGTH 2. WHEN OBSERVING CONDITIONS OF PERIMETER SEDIMENT CONTROLS, <br /> PAY SPECIAL CONSIDERATION TO THE PRESENCE OF INDICATORS THAT <br /> WATER IS ERODING AROUND THE ENDS,UNDERCUTTING THE BARRIER, <br /> INSTALLATION NOTES OR SIGNIFICANT EROSION IS OCCURRING DOWNSLOPE.THESE ITEMS <br /> MAY INDICATE THE NEED FOR USE OF A DIFFERENT PRACTICE OR <br /> INCORRECT INSTALLATION. <br /> 1. PROPRIETARY PRODUCTS SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. <br /> 3. SEDIMENT SHALL BE REMOVED FROM BEHIND PERIMETER SEDIMENT <br /> 2. IF CONSTRUCTING USING STRAW BALES,BALES MUST BE INSTALLED PER THE REQUIREMENTS CONTROL BARRIER WHEN IT REACHES If THE HEIGHT OF THE LOWEST <br /> DESCRIBED IN STANDARD DETAIL T-OHD-MSC-031. ELEVATION. <br /> a WHEN JOINTS ARE NECESSARY,OVERLAP AND SECURE TO MINIMIZE POTENTIAL FOR 4. PERIMETER SEDIMENT CONTROLS SHALL BE REMOVED ONCE <br /> CONCENTRATED FLOW. PERMANENT VEGETATION IS ESTABLISHED. <br /> 4. IF CONSTRUCTING PERIMETER SEDIMENT CONTROL OUT OF EARTHEN BERMS,A STABLE 5. MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE WITH <br /> OUTLET(S)MUST BE PROVIDED WHICH WILL DISTRIBUTE THE DISCHARGE OF STORMWATER TO A CONSIDERATION FOR SITE CONDITIONS. <br /> STABILIZED LOCATION. <br /> 5. INSTALL ALL PERIMETER SEDIMENT CONTROL PRACTICES SUCH THAT THE ENDS TIE INTO THE <br /> SLOPE TO PREVENT EROSION FROM CONCENTRATED FLOW AROUND THE END OF THE DEVICES. <br /> 8. PERIMETER SEDIMENT CONTROL PRACTICES SHOULD BE USED IN CONJUNCTION WITH <br /> PERMANENT RESTORATION PRACTICES. <br /> 7. WHEN NOT USED IN CONJUNCTION WITH OTHER PRACTICES,INSTALL PERIMETER SEDIMENT <br /> CONTROL PRACTICES PER THE SPACING REQUIREMENTS OF THE FOLLOWING TABLE: <br /> SLOPE SPACING <br /> <2% 100 FEET <br /> 2-5% 75 FEET <br /> 5-10% 50 FEET <br /> °NCA <br /> KY E PERIMETER SEDIMENT BARRIER <br /> CHECKED: DATE <br /> AL OUTING <br /> OVED DA TTE P.aeun+XwRPXCOMMA STANDARD EROSION CONTROL DETAIL <br /> REV CATE DESCRIPTION DRAWN CFMD APPD CAM! SCALE: =NT3 STANDARDS 1 1 T-OHD-MSC-026.0001 v00 <br /> THIS DOOMENT IS FOR THE MS GENERIC-AN TRANSMISMON COIPANY.AMERXUN TRANSMISSION COMPANY warmsµLWARRANTIES BOTH DIRTIES-AND IMPLEO.USE BY ANYONE OINERTWNAMERICAN TRANSMISSION COMPANY M AT THEIR OM RISK OAMERICAN TRANSMISSION COMPANY 2008 <br /> ...\dms02355\T-OHD-MSC-026.000.dgn 6/1/2009 8:11:23 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.