Laserfiche WebLink
Petition # iC 0 5'/ Public Hearing Date /ti/2-S7'T <br /> -_'-t':�.-° �.ti�-q�--���_�'T'`�i`^-��� ,tom �,.�3.. - ,�._+�.<c..,r", <br /> . +r•' -.:��_...`3aa�.x-yam :S:— a-r-�-==e�-.a�:�:5 -¢ .. <br /> ' ' Application filled out and signed <br /> >f Metes and bounds description <br /> qY Scaled map <br /> Letter of intent <br /> ❑ If commercial, plan showing proposed improvements (building, parking, landscape) <br /> F��ns!:�'�� ���,�'-�n= ,�;;t=.-"ti,J:�:^:�-^- - ^...,-�r�:��� r•�°`'`.��v==�.:yc:�-cam-`-"--s`�x�i.-_°= �.-�Y..a;s.'�r_�Y <br /> 1.: Zoning District fits the proposed land use? 1 / No <br /> 2. Zoning District fit the proposed and remaining lots (s)? % f No <br /> 3. Proposed lot meet the minimum width and area requirements? Cat / No <br /> 4. Do the existing structures meet the setbacks for the District? Yes / No �. <br /> 5. Do the existing structures meet the height limitations? Yes / No <br /> 6. Do the existing (proposed) structures meet the lot coverage? . Yes / No / <br /> 7. Do the Accessory structures meet the principal-structure-ratio? Yes / No <br /> 8. Existing building heights conform to district? Yes / No <br /> 9. Shoreland, Wetland, Flood plain issues? Yes / . <br /> 10.Steep slope issues? Yes / .•t. <br /> 11.Commercial parking standards met? Os ./ No . <br /> 12.Screening requirements met? e / No <br /> 13.Outside lighting requirements? / No <br /> Comments: <br /> d T:,k�, „ <br /> 1. Density Study Needed? Yes / Splits <br /> 2. Determination of Legal Status es / <br /> 3. In compliance with Town plan? . I No <br /> 4. Land Division Compliance?. tj / No <br /> Comments: <br /> • <br /> Contacts/Correspondence: (date:issue) <br />