Laserfiche WebLink
Six Standards of a Conditional Use Permit <br /> Provide an explanation on how the proposed land use will meet all six standards. <br /> 1. The establishment, maintenance or operation of the conditional use will not be detrimental to or endanger the <br /> public health, safety, comfort or general welfare. <br /> All operations are performed inside the building and it will be closed to the public. Only my <br /> work related to my business will be done inside the building, there will be no retail sale <br /> transactions on site. The building will be far from any neighbors to keep the possibility of any <br /> discomfort to the smallest amount possible. <br /> 2. The uses, values and enjoyment of other property in the neighborhood for purposes already permitted shall be in <br /> no foreseeable manner substantially impaired or diminished by establishment, maintenance or operation of the <br /> conditional use. <br /> I plan to build to the west of the home creating a buffer to the one home to the east of <br /> ours. The building will be out of sight from that home owner and far enough away to not <br /> be able to hear any work being done. <br /> 3. That the establishment of the conditional use will not impede the normal and orderly development and <br /> improvement of the surrounding property for uses permitted in the district. <br /> The surrounding property is Donald County Park and will have no foreseeable <br /> improvements. I plan on using siding on the building that will blend into the natural <br /> environment so as to not take away from the surroundings. <br /> 4. That adequate utilities, access roads, drainage and other necessary site improvements have been or are being <br /> made. <br /> The building will have 220 electric which can be ran from the home or from existing power lines. I will do <br /> whichever the electric company sees as a better option.The site is flat but will be graded to correctly <br /> drain run off.An access road to the building will be added to an existing driveway. <br /> 5. Adequate measures have been or will be taken to provide ingress and egress so designed as to minimize traffic <br /> congestion in the public streets. <br /> I do have raw materials delivered where my current work shop is located just down the street from <br /> the proposed new building; I have never had any problems with stopping or congesting traffic. I <br /> plan on having deliveries come straight to the work shop off the street and down the driveway. <br /> 6. That the conditional use shall conform to all applicable regulations of the district in which it is located. <br /> I do plan on following all building and zoning codes for the township of Springdale and Dane <br /> County. <br />