|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02374
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 11:42:09 AM
Creation date
5/9/2017 11:31:50 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02374
Town
Rutland Township
Section Numbers
1
AccelaLink
DCPCUP-2017-02374
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ELL <br /> Quality Saves Money <br /> their equipment. In this case,Verizon Wireless needs the site to meet its service needs for the defined search <br /> area,and has engaged SBA to participate as the tower developer/owner for the project. <br /> As described above,the proposed project is for the construction, installation,and operation of an unmanned <br /> wireless tower communications facility upon the property located at 1471 US Hwy 51,Stoughton,WI 53589, <br /> Parcel ID#052/0510-011-9801-9.This facility will consist of Verizon Wireless antennas and equipment to be <br /> mounted at the 120' centerline of a newly constructed SBA owned 125' tall monopole tower(extendable to <br /> 150')plus 4.5'lightning rod,associated coaxial/hybrid cable runs down the interior of the tower,and <br /> equipment cabinets on platform with exterior backup power generator which will be placed upon a concrete <br /> pad near the base of the tower,all within a 50'x 70' fenced SBA compound as shown in the enclosed plans. <br /> Also,a 24' foot wide access and utility easement will be utilized to serve the site coming from the public right <br /> of way of Oak Opening Drive. <br /> This Conditional Use Permit will provide a great benefit in that it will allow for the provision of the highest <br /> quality and most technologically advanced wireless communication services to the area. Besides the services <br /> which will be provided by Verizon Wireless,the tower facility has been designed so it will be available for at <br /> least three(3)other comparable antenna and equipment installations and shall conform to all applicable <br /> ANSI/TIA 222-G,FCC,and FAA regulations and standards governing such facilities. Multiple company <br /> collocations on its infrastructure is the core of SBA's business and SBA actively markets its portfolio of tower <br /> sites for collocation to all communications users. <br /> The proposed facility will not require any public participation or result in any public cost for public facilities <br /> and services which would be detrimental to the economic welfare of the community. In fact,the wireless <br /> communication services offered by Verizon Wireless are desired by both businesses and individuals and will <br /> be an economic asset to the community. The enhanced E-9l 1 services provided by facilities such as these will <br /> also assist in the protection of the public health,safety,and welfare of the community. <br /> The equipment will operate continuously at this unmanned facility and will require no additional parking or <br /> facilities for employees.Verizon Wireless' cell site technicians will visit the site periodically,typically a <br /> couple hours once per month,for the testing and monitoring of the maintenance and security of its equipment. <br /> SBA Communications personnel will also visit the site periodically to monitor the maintenance and security of <br /> the facility.The facility will-not generate any substantial traffic,and besides the new tower structure,the <br /> remainder of the equipment has a minimal visual impact and generates very little noise. <br /> This site is located in the C-2 Commercial District and has been positioned upon the underlying parcel in <br /> location to best conform with the current and future uses of the underlying property. No landscaping buffer is <br /> proposed given the location in the rear of the parcel,proximity of existing tree cover blocking views to the <br /> west and north and limited offsite views from Oak Opening Drive, Deer Point Drive and Hwy 51. The <br /> location of the proposed tower upon the property is setback from the nearest property line 55';the designed <br /> collapse radius of the tower. Enclosed please find a stamped engineering letter from Sabre Industries Towers <br /> and Poles,SBA's tower manufacturer,ensuring that that the tower will be designed to collapse within the <br /> subject property in the event of structural failure. <br /> Besides the six(6)application requirements defined by Wis. Stat. Sect.66.0404(2)(b),I have also enclosed the <br /> below listed items and provided additional narrative as requested by Dane County and agreed to by the <br /> applicant. <br /> PO Box 578790/Chicago,IL 60657 tel: (773)919-5112/fax:(866)684-3535 <br />
The URL can be used to link to this page
Your browser does not support the video tag.