|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02371
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 12:01:56 PM
Creation date
5/9/2017 11:57:57 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02371
Town
Blue Mounds Township
Section Numbers
14
AccelaLink
DCPCUP-2017-02371
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINKS <br /> Paving,Excavating&Concrete <br /> 2732 State Hwy 78-Mount Horeb,WI 53572 0-608.437.5779 F-608.437.5749 <br /> www.finkspaving.com <br /> EROSION CONTROL AND <br /> STORMWATER MANAGEMENT PLAN <br /> EROSION CONTROL MEASURES: <br /> ENTRANCE: <br /> The entrance to this site already is a Asphalt Paved surface which prevents the tracking of <br /> material onto public roads <br /> BERMS: <br /> The stripped soils will be separated in stock piles, and the overburden will be stripped and <br /> used as the base of any berms that need to be made for visual, decorative and noise barriers, and the <br /> remaining topsoil will be used to top dress the berms. Any berms will be seeded and mulched as soon <br /> as practical. <br /> SILT FENCING: <br /> Silt Fencing will be used as necessary when soils are being stripped and stockpiled and <br /> removed only when grass vegetation has been established to prevent runoff. <br /> SEEDING& MULCHING PROCEEDURE: <br /> All berms and non-farmable areas will be seeded at a rate of 7 pounds per 1000 square feet of <br /> #20 WisDot Specification seed mixture. Any disturbed areas will be seeded within 7 days of <br /> completion of the rough grading of topsoils. To optimize growth, all planting will be conducted <br /> between May 15th and no later than September 15t. <br /> MAINTENANCE: <br /> Any existing berms or other designed barriers will be inspected and repaired according to <br /> needs of the site. The driveway will be maintained,plowed and inspected to keep a clean surface free <br /> of rocks or debris that could be picked up with truck tires. <br /> WATER RUNOFF: <br /> This site is internally draining,with a pond at the bottom of the quarry that is naturally <br /> draining. All water is directed toward this pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.