|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02371
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 12:01:56 PM
Creation date
5/9/2017 11:57:57 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02371
Town
Blue Mounds Township
Section Numbers
14
AccelaLink
DCPCUP-2017-02371
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�( �,, Public Hearing: March 28, 2017 Petition: CUP 2371 <br /> h1 T � Zoning Amendment: Town/sect: <br /> , Staff Report None Blue Mounds <br /> Section 14 <br /> Acres: 70 Applicant <br /> Survey Req. No Diane V Fink <br /> Zoning and Land Regulation Committee Reason: <br /> Continuation of an existing Location: <br /> mineral extraction operation 2732 State Highway 78 <br /> .-- a. E—".....*•-•'..". .i.".'''''.. .-- \\\U <br /> 4.,7E• <br /> '�{� O <br /> C �, } inks Paving and Exc.Ming <br /> \., ,_.43.....,-,- f n <br /> 0. <br /> .urn 1 �2 a <br /> 1 0 ° Village of Mount Horeb <br /> .ttn <br /> o to r OR in i1 IS �} ° <br /> „[- qad Meadov� .n• [l <br /> I vim m E ,.1.2 '�i` busting Quarry <br /> tp re <br /> 1 \ Li �4'144p Idirr <br /> \\11111‘:' mil i <br /> • <br /> wa <br /> r.\_ <br /> II - Gl aaer_Td w , <br /> Ii �1oga9d� S <br /> I <br /> 1 I.E..., <br /> .J <br /> 1 <br /> DESCRIPTION: The Finks would like to be allowed to continue an existing non-metallic mineral extraction operation <br /> which is used in conjunction with Finks Paving and Excavating. The quarry has been in operation since 1988. The <br /> current conditional use permit, CUP#1759, will in April 2017. The proposed expansion limit end approximately 700 <br /> feet from the Village limits. <br /> OBSERVATIONS: The Finks own approximately 220 acres of land just west of the Village of Mt. Horeb. A portion of <br /> the land, south of Highway 78, is used for Finks Paving and Excavating. The business also operates a quarry on the <br /> site to support the excavating business. The quarry has been in operation since 1988. The site produces <br /> approximately 60,000 tons of aggregate per year. Blasting occurs approximately 3 times per year. The quarry is <br /> proposed to expand to the east, removing the knoll in the center of the property. 50% of the area contains Class II <br /> soils. No other sensitive environmental features observed. The current quarry wall is approximately 1400 feet west of <br /> the Brookstone Ridge Subdivision. Additional information provided in the attached Staff Report. <br /> COMP PLANS: The Town Plan designates this area as an agricultural transition area which will eventually be <br /> annexed into the Village of Mount Horeb. The quarry expansion area is within the Mt. Horeb Urban Service Area. <br /> The Village of Mount Horeb Comprehensive plan designates the area to be used for future planned neighborhood <br /> development. <br /> RESOURCE PROTECTION: The proposal is outside the resource protection area. <br /> 3/28 ZLR: the petition was postponed due to public opposition regarding safety, screening, and reclamation of the <br /> site. <br /> TOWN: Approved as presented. The Village of Mount Horeb also suggested that the CUP should be approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.