|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02373
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 1:35:09 PM
Creation date
5/9/2017 1:04:19 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02373
Town
Albion Township
Section Numbers
35
AccelaLink
DCPCUP-2017-02373
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conditional Use Permit - Mineral Extraction <br /> Application Checklist <br /> Applicant Zoning <br /> Plan Requirement Location in plan -page # <br /> 1. Legal description -CSM and/or exact metes & bounds. <br /> Size of area requesting -acreage V E.XN u t'r A <br /> Parcel number(s) <br /> 2. Written statement that includes the following: <br /> General description of the operation. ✓ VIMCIzATIVEC <br /> Existing uses of the land. ✓ <br /> Existing natural features including depth to groundwater. ✓ g exHit3i1 13 C <br /> ✓ Types and quantities of materials that will be extracted. ✓ Gv <br /> Proposed dates to begin extraction, end extraction <br /> • and complete reclamation. V‘ <br /> Proposed hours and days of operation. ✓ r (,¢ <br /> ✓ Geologic composition and depth to the mineral deposit. ✓ r <br /> Identify all major proposed haul routes to the nearest <br /> Class A highway or truck route. ✓ P '7„ <br /> Indicate traffic flow patterns. <br /> Proposed phasing plan (recommended for larger sites) EXy'err P <br /> Types, quantities and frequency of use of equipment to <br /> extract, process and haul. ✓ P xH l -r <br /> Frequency of blasting, drilling, mining, crushing, screening, <br /> washing, refueling. I <br /> Bulk fuel storage. ✓ e <br /> Asphalt batching or concrete mixing. ✓ r <br /> Proposed storage of recycled materials. ' p e <br /> Does extraction occur below the water table/protectio <br /> of groundwater. %1A051t l(),efec so✓rot &AA c ` /g <br /> Permanent or temporary structures. ✓ pg <br /> Spill prevention and or dust control. ✓ r <br /> Proposed use after final reclamation as consistent GoJer `ei <br /> with Ch. 74. Separate checklist for reclamation permit. ✓ <br /> This checklist is required in addition to a complete application for a conditional use permit Application maybe <br /> deemed incomplete if required information is not submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.