|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02373
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 1:35:09 PM
Creation date
5/9/2017 1:04:19 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02373
Town
Albion Township
Section Numbers
35
AccelaLink
DCPCUP-2017-02373
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br /> Deficiencies in Hoffman's CUP Application <br /> DCO § 10.123(3)(d)provides that"non-metallic mineral extraction operations"may be a <br /> conditional use in the A-1 Exclusive Agriculture District, but it requires that"[t]he application <br /> shall conform to the requirements of s. 10.191(2). <br /> • As described below, Hoffman's application does not conform with § 10.191(2). <br /> DCO §10.123(3)(e) states that asphalt plants or ready-mix concrete plants may be a conditional <br /> use"for production of material to be used in construction or maintenance of public roads, to be <br /> limited in time to project duration." <br /> • Based on this requirement, if a permit is granted, the duration of the permit should be <br /> strictly limited to the duration of the highway project. <br /> DCO § 10.191 (2)provides: The application for the conditional use permit necessary to conduct <br /> a mineral extraction operation shall include the following information: <br /> (a) A legal description of the land for which the permit is requested. <br /> (b) Tax parcel number(s)of the lot(s) or parcel(s) where the conditional use is to be located. <br /> If the area proposed for the conditional use is a part of a larger parcel, applicant must <br /> provide the tax parcel number of the larger parcel. <br /> (c) A written statement containing the following information: <br /> 1. General description of the operation. <br /> 2. Existing use of the land. <br /> 3. Existing natural features including approximate depth to groundwater. <br /> 4. The types and quantities of materials that would be extracted. <br /> 5. Proposed dates to begin extraction, end extraction and complete reclamation. <br /> 6. Proposed hours and days of operation. <br /> 7. Geologic composition and depth to the mineral deposit. <br /> 8. Identify all major proposed haul routes to the nearest Class A highway or truck <br /> route. Indicate traffic flow patterns. <br /> • Traffic flow patterns have not been indicated. Nor has information been provided <br /> describing the traffic to be produced by this operation. <br /> Ex. A—pg.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.