|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02373
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 1:35:09 PM
Creation date
5/9/2017 1:04:19 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02373
Town
Albion Township
Section Numbers
35
AccelaLink
DCPCUP-2017-02373
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(e) An erosion control plan, drawn to scale by a professional engineer, meeting all applicable <br /> state and county requirements. <br /> • To our knowledge this was not provided to the Town as part of Hoffman's CUP <br /> application and neither the Town nor the public have had adequate time to comment <br /> on the document recently provided by Hoffman. <br /> (f) A reclamation plan prepared in accordance with the Wisconsin Administrative Code and <br /> the Dane County Non-metallic Mining Reclamation Ordinance. <br /> • To our knowledge this was not provided to the Town as part of Hoffman's CUP <br /> application and neither the Town nor the public have had adequate time to comment <br /> on the document recently provided by Hoffman. <br /> DCO § 10.255 (2)(e)provides: An application for a conditional use shall be filed with the <br /> zoning administrator on a form prescribed by the zoning administrator. The application shall be <br /> accompanied by such plans and other information as required by this section or as may be <br /> prescribed by the zoning administrator or the zoning committee, and shall include a statement in <br /> writing by the applicant and adequate evidence showing that the proposed conditional use shall <br /> conform to the standards set forth in par. (h) hereinafter. <br /> 1. Site plan. All applications for a conditional use permit must be accompanied by a site <br /> plan, drawn to a scale large enough to show detail, that includes, at a minimum the <br /> following information: <br /> a. All buildings and all outdoor use and/or storage areas, existing and proposed, <br /> including provisions for water and sewer. Existing and proposed uses must be <br /> clearly labeled. <br /> • We understand Hoffman will apply for a high capacity well. The location of any such <br /> well is not shown. <br /> b. All dimensions and required setbacks, side yards and rear yards. <br /> • If there are any setback requirements, none are shown. <br /> c. Location and width of all driveway entrances onto public and private roadways, <br /> and of all interior roads or driveways. Traffic flow patterns must be indicated. <br /> • Interior roads/driveways do not appear to be adequately shown. For example, the <br /> Site/Operations Plan has an arrow point to"Access to NB I-39 Construction", but <br /> there is no interior road shown. As stated above, traffic flow patterns are not shown <br /> anywhere. <br /> d. Parking lot layout in compliance with Section 10.18 of the Dane County Zoning <br /> Ordinance. <br /> Ex. A—pg.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.