|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00287
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2017 10:59:43 AM
Creation date
5/24/2017 4:25:13 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00287
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i E. fi 1 C, N i' L A h.f'O et T <br /> t z ,.. V.,, ,r. 2 4 F t 8 • 24 6 -0? r sn irport.com <br /> D A N E <br /> COUNTY <br /> REGIONAL <br /> AIRPORT <br /> MADISON <br /> May 23, 2017 <br /> Scott Schroeckenthaler <br /> Zoning Inspector <br /> Dane County Zoning Division <br /> 210 Martin Luther King Jr. Blvd. <br /> Department of Planning and Development <br /> Room 116, City-County Building <br /> Madison, WI 53703-3342 <br /> Re: Permit Application under §78.06 Dane County Ordinance <br /> Crane Am Fam Spark Tower <br /> N43-04-51.15 W89-22-25.99 <br /> Dear Mr. Schroeckenthaler: <br /> Below are the conditions the Airport requests the Zoning Administrator establish <br /> for issuance of the permit. <br /> CONDITIONS APPLICABLE TO CRANE, AM FAM SPARK TOWER PERMIT: <br /> (1) Applicant shall comply with all conditions and recommendations set forth in <br /> the Determination Letter regarding Federal Aviation Administration Aeronautical <br /> Study No. 2017-AGL-4472-OE. <br /> (2) Prior to erecting the construction crane, applicant shall provide the on duty <br /> Airport Operations Supervisor, Dane County Regional Airport (office: <br /> 608.246.3397, cell: 608.235.1001), with the name and telephone number of an <br /> individual(s) having authority over operation and placement of the crane while it <br /> is on the construction site and, upon request, shall arrange a meeting between <br /> Airport staff and the contractor that will be operating the crane. <br /> (3) Applicant shall, at least three days before the crane height will reach 1,081 <br /> feet MSL, provide notice to Airport Operations. <br /> (4) At all times the highest point of the crane shall be marked during daylight <br /> hours with an orange and white checkered construction flag measuring at least <br /> three feet by three feet, and with a red obstruction light, with a minimum intensity <br /> of 32.5 candela, from two hours before sunset until two hours after sunrise and <br /> during periods of reduced visibility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.