|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00303
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 3:22:25 PM
Creation date
6/6/2017 3:22:23 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00303
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3/14/2017 <br /> alARYVerona,WI 53593-0220 Doc ID:51298201670314160219 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Roofline Wind Bracing <br /> Foundation <br /> Type:In Ground <br /> Concrete Floor:Yes-Supplied by Cleary(Concrete not included unless otherwise noted in writing in the Additional Building <br /> Components section) <br /> Column Anchoring <br /> Side Wall:Anchor Block(standard) <br /> End Wall:Anchor Block(standard) <br /> Corner Columns:Anchor Block(standard) <br /> Column Footing <br /> Side Wall:4"x 14" Precast Footing (Standard) <br /> End Wall:4"x 14" Precast Footing (Standard) <br /> Corner Columns:4"x 14" Precast Footing (Standard) <br /> Roof Finish and Accessories for Building 1 <br /> Exterior Finishes <br /> Roof:Grand Rib 3 Plus <br /> Ventilation <br /> Roof <br /> Ridge Cap <br /> Ridge Lites(Solar)Standard:For venting the entire ridge. <br /> Marco LP2 Weather-Tite Ridge Vent"Low Profile"(Add ventilation to ridge). <br /> Accessories <br /> Roof <br /> Condensation Control for Building 1: None <br /> Ceiling for Building 1 <br /> Ceiling Insulation:No Fiberglass Batt Insulation Included <br /> CeilingType:None <br /> Ceiling Nailers:None <br /> A total of 0 cut outs are included in this total project(for electrical/plumbing,etc)in the interior finishes,any additional <br /> cut outs will be an extra charge. <br /> Elevations for Building 1 <br /> v12/10 2 of 17 <br /> C <br /> v12/10 built with pride before the � � is applied <br />
The URL can be used to link to this page
Your browser does not support the video tag.