|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2017-00006
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPFLO-2017-00006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 4:01:05 PM
Creation date
6/7/2017 2:49:46 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2017-00006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N <br /> �"` T.` _•.9,t-:-.2,,,,,,.;_ �, DEPARTMENT OF THE ARMY <br /> a4 ST.PAUL DISTRICT,CORPS OF ENGINEERS <br /> 4 r ' )\ 180 FIFTH STREET EAST,SUITE 700 <br /> II': m ST.PAUL,MN 55101-1678 <br /> \ z� REPLY TO ATTENTION OF <br /> .ryFs% REGULATORY BRANCH <br /> May 10, 2017 <br /> Regulatory File No. (MVP-2017-01386-KJH) <br /> Greg Hyer <br /> Town of Cross Plains <br /> 3734 County Road P <br /> Cross Plains, Wisconsin 53528 <br /> Mr. Hyer: <br /> We have received information about your proposed project by the Town of Cross Plains <br /> to discharge fill material into 755 square feet of wetlands for the reconstruction of Stagecoach <br /> Road from County Highway P to US Highway 14. The project site is in Sections 10 and 11, <br /> Township 7 North, Range 7 East, in Dane County, Wisconsin. <br /> The work that you describe appears to fit the general activity information described in <br /> Department of the Army GP-002-WI Permit (DA permit) for Maintenance (Category 1.a.1). <br /> Based on the information submitted to our agency, it appears that no application or notification <br /> to the St. Paul District Corps of Engineers (Corps) is required for your project. <br /> This letter is not a verification of DA permit eligibility, but an indication that your project <br /> may meet the requirements for DA permit eligibility. It is your responsibility to ensure that the <br /> work proposed will meet all applicable terms and conditions of the DA permit before starting <br /> work. A full list of applicable terms and conditions for eligibility may be found by visiting our <br /> website at http://www.mvp.usace.army.mil/Missions/Requlatory.aspx. If you prefer we mail you <br /> a copy of the applicable terms and conditions, please contact us at 1-800-290-5847, extension <br /> 5525. <br /> We did not determine whether the wetlands or other waters on the site are subject to <br /> Corps jurisdiction. You may request a jurisdictional determination from the Corps contact <br /> indicated below. It is not necessary to request a jurisdictional determination from the Corps if <br /> you do not object to the DA permit compliance requirements described above. <br /> If you have any questions or, if after reviewing the DA permit terms and conditions, you <br /> believe your proposed project requires specific written authorization from our agency, please <br /> contact me at(651) 290-5903 or Kerrie.J.Hauser @usace.army.mil. In any correspondence or <br /> inquiries, please refer to the Regulatory number shown above. <br /> Sincerely, <br /> Kerrie Hauser <br /> Regulatory Project Manager <br /> cc: WDNR, Wendy Peich Water Management Specialist <br /> WDNR, Eric Heggelund Transportation Liaison <br /> MSA Professional Services, Brad Reents <br />
The URL can be used to link to this page
Your browser does not support the video tag.