Laserfiche WebLink
DANE COUNTY ZONING PERMIT ZONING PERMIT NO Page2of2 <br /> DCPZP-2016-00034 <br /> Conditions:l. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS AR 19E WITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. INITIALS <br /> REQUIREMENT: A LOCATION SURVEY IS REQUIRED TO VERIFY COMPLIANCE WITH <br /> ZONING ORDINANCE SETBACKS. THE SURVEY SHALL BE PREPARED BY A REGISTERED LAND <br /> SURVEYOR, AND MUST BE RECEIVED BY DANE COUNTY ZONING WHEN THE <br /> FOUNDATION/BASEMENT WALLS ARE COMPLETED, OR IF THE PROJECT DOES NOT INCLUDE <br /> FOUNDATION/BASEMENT WALLS, AT THE TIME THE LOCATION OF THE STRUCTURE IS <br /> ESTABLISHED, AND BEFORE ANY OTHER WORK IS DONE. <br /> EROSION CONTROL: OWNER/AGENT MUST CONTACT THE DANE COUNTY DEPARTMENT OF <br /> LAND & WATER RESOURCES (608-224-36 7, A VE IT DETERMINED IF AN EROSION CONTROL <br /> PERMIT IS REQUIRED. SIGNATURE Z_V_•• DATE Z-&-"/ <br />