Laserfiche WebLink
5/10/2017 <br /> Cl i111( P.0 Box 930220 BEHRINGER,BARRY <br /> Verona,WI 53593 0220 Doc ID:3883820170510091631 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> Clearyeuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Truss Type <br /> Fthtitt�(1 IT l ui�#N <br /> ,.tlt €ice <br /> /> Zits c=t' /. % <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 4/12 <br /> Roof Peak Height: 21'4" <br /> -, "A" =Actual Eave Height: 15'4" <br /> Q "B" =Truss clearance at heel and center: 14'0" <br /> m I (Truss clearance= 1-0"less than nominal eave height,in most cases. <br /> 11,,1001+0" If nested purlins are used,truss clearance will be increased by 4".) <br /> Standard Lower Chord Truss (SLC) <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation(B.E.)of overhead door: 0'4" <br /> The bottom of all overhead doors(top of finished floor)are <br /> recommended to be placed at 4"above the 100'-0"mark(100'-4"). In <br /> T -' building without paved floors, B.E.of doors may be lower-e.g. 100'- <br /> # w.<-_: <br /> 1 Tla'_i 0". <br /> "E" = Height of overhead door: 7'0" <br /> ;.-w <br /> ii--- <br /> Overhead door height=the height of the overhead door being placed <br /> I <br /> in this building. <br /> ', 1 i "F" =Available headroom: 6'8" <br /> Available headroom =the space available for overhead door tracks <br /> 1 =' and openers. If a ceiling is installed, headroom will be reduced by <br /> I 1 <br /> 1t I I about 1". Door headroom requirements must be confirmed with the <br /> x I -TOP r11 FINISuE:I c I door supplier. <br /> i 2 FLOOR <br /> i..._+„!______, . __mac c. - Headroom calculation formula: <br /> t '1 _ . <br /> B" D" ("E") = ("F") <br /> (Truss Clearance)-(B.E.of overhead door)-(Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0")-(4")-(8'-0") = (1'-8"of available headroom) <br /> i <br /> C150- 0 built with pride before the is applied R 13 of 19 <br /> i <br /> I <br />