Laserfiche WebLink
Dane County For Office Use Only Revised 01.03.2017 <br /> Erosion Control Permit Permit Number: <br /> Application Application Received By: , Date- <br /> (Application must be made in person. Application Approved By Date: <br /> Incomplete applications will not be accepted) <br /> Associated Permits: <br /> Project Name: Zilm Residence Applicant Information (Individual making in-person application) <br /> Landowner Name(s): Danielle Zilm Applicant Name: Danielle Zilm <br /> Landowner Address: 4129 Dwight Drive Applicant Address: 4129 Dwight Drive <br /> Madison, WI 53704 Madison, WI 53704 <br /> Landowner Phone: (6 0 8) 886-6524 Applicant Phone: (6 0 8) 886-6524 <br /> Landowner E-mail: danielleknore@att .net Applicant E-mail: danielleknore@att .net <br /> Name and company of engineer/consultant who prepared the plans: Professional Engineering, LLC <br /> Type of Permit: Erosion Control Shoreland Erosion Erosion Control <br /> (check only one) (EC) (SE) <br /> Municipality:Town of Burke Section: 10 Quarter: SE Parcel#: 0810-104-4101-8 <br /> Fee Calculation(all projects must include disturbed area and new impervious area) <br /> Total Disturbed Area 17, 150 ft2 x$0.006/ft2 =$ 102 . 90 <br /> Total New Impervious Area 4 , 425 ft2 <br /> (includes gravel) <br /> Total Redevelopment Impervious Area 0 ft2 <br /> (includes gravel) <br /> Base Fee: Erosion Control(EC) $200 OR Shoreland Erosion Control(SE)$400 Base Fee=$ 400 . 00 <br /> ❑Check box to apply$200 base fee for Shoreland Erosion Control <br /> (SE)projects meeting criteria in s. 11.05(2)(c) Total Fee=$ 502 . 90 <br /> Notes: <br /> 1.All requirements included in this application correspond to the requirements set forth in Chapters 11 and/or 14 of the Dane <br /> County Code of Ordinances. <br /> 2. By submitting this application, permittee and landowner permit Dane County staff to enter project property for inspection and/or <br /> curative action (s. 11.05(5)(a)3 or 14.49(4)(c)). <br /> 3. Late filing fee: The permit fee shall be doubled where work has begun before a permit has been obtained(s. 11.50(7)or <br /> 14.55(2)(b)). <br /> Applicant Signature: Date: <br /> If the person submitting the application is not the landowner,a notarized statement authorizing the applicant to act as the <br /> landowner's agent must be attached. <br /> This application must be submitted in person (M-F, 8 A.M. —4 P.M.) <br /> with two copies of all permit materials & fees to: <br /> Water Resource Engineering Division, 5201 Fen Oak Drive, Room 208, Madison, WI 53718 <br />