Laserfiche WebLink
A location survey, by.a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify.the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> T 1 <br /> you ,may-nee_d this;if_� :3r l °s <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57' 40" E 254.01' F Side Setback area <br /> ,� Rear <br /> P /iiaiioii/////%i � �i, ��� 1 <br /> Setback <br /> 0 -I 4 <br /> A 10 Feet F <br /> V Needs a 4 W <br /> ® !!!!!!!! Location <br /> w W <br /> co w rn <br /> Survey / Setback W <br /> ® O � Propused 169.8' %%� Line <br /> �,a N Q Addition 0 z O <br /> a(Ym a 35. ( I ��' z is <br /> co <br /> Z to <br /> _1(ir. tle::IV..,;4' .' J 4 <br /> tI <br /> • r <br /> I Side Setback area N 72°57'40,r W <br /> I <br /> 33' 33' I I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions.I understand that failure <br /> . to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning &Development to deterininb compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent •DATE: <br /> SIGNATURE: OwnerlAgent <br /> Z .1) G.`_ ",rl— S..1!------U <br />