Introduction&Intentions <br /> Ready Mix Concrete <br /> Ready mix concrete (RMC)is an essential building material for use in a variety of civil construction <br /> projects such as buildings, roads, bridges, and a variety of other structures. As the Wisconsin <br /> Department of Transportation (WisDOT)and a variety of other municipalities continue efforts to update <br /> and expand the Interstate 39/90 corridors in Dane County and beyond,the demand for a locally <br /> available and economical option for the production and distribution of RMC is critically important to on- <br /> time and on-budget projects to reduce the costs to tax payers and impacts on commuters for these <br /> projects. <br /> Based upon the onsite availability of some ingredient aggregate materials as well as the proximity to the <br /> proposed construction work,the Koshkonong Rd site offers an ideal location for the staging of a <br /> portable,temporary RMC plant to be used on the 139/90 and supporting municipal projects. Trierweiler <br /> Construction is requesting this conditional use permit on behalf of Forever Sandfill and Limestone Inc <br /> (Pit Operator& Lessee)and Joel Hougan (property owner)to operate a temporary RMC plant from May <br /> 1st 2017 to December 31st,2020 for projects awarded on the 139/90 expansion project as well as <br /> associated WisDOT and municipal road construction projects. <br /> Siting <br /> The site,consisting of Parcel 046/0611-094-9000-5 currently operates as a quarry/pit. It is proposed <br /> that the temporary RMC plant would be located in the southern 10 acres of the parcel. The conditional <br /> use permit area is approximately 0.87 acres in size,for the exact location please see the attached <br /> mapping. This would put the plant in the currently active portion of the pit and in close proximity to <br /> available material needed for batching RMC. The plant location would also follow proper setback <br /> requirements identified in Dane County Zoning Regulations for the site's A-1EX Exclusive Agriculture <br /> district zoning,which are discussed further in the following sections of this letter. Please see the <br /> attached mapping for exact setbacks. No building or structure beyond the mechanical equipment is <br /> proposed as part of the application. The RMC batch plant will be temporary and portable in nature so as <br /> to be located adjacent to where the aggregate production is occurring. <br /> Operation Description <br /> The proposed temporary/portable installation of a RMC plant would be utilized to mix concrete and <br /> load trucks to the 139/90 corridor expansion and associated WisDOT and municipal projects. While the <br /> exact number of employees varies between 5 and 15 on the RMC operations team. Operational periods <br /> will include generally day time operating hours(6:00 AM—8:00 PM)during week days and intermittent <br /> operation during weekends only as project demands necessitate. However,WisDOT does sometimes <br /> require nighttime work to limit impacts to drivers and to improve worker and driver safety. As such,for <br /> some segments of the project this Conditional Use Permit application requests 24-hour operation to <br /> accommodate the WisDOT 139/90 construction schedule. It should be worth mentioning that nighttime <br /> operation will only be utilized when mandated in the plans and proposals by WisDOT. <br />