Six Standards of Conditional Use <br /> Per the Conditional Use Permit Requirements, an explanation outlining how the proposed land use <br /> meets each of the following six(6) standards for Conditional Use is included in the following sections. <br /> 1. The establishment, maintenance, or operation of the conditional use will not be detrimental to or <br /> endanger the public health,safety, comfort, or general welfare. <br /> The proposed temporary ready mix concrete plant operations will have minimal impact to the public. All <br /> ingredients with the exception to the limestone aggregates and cement, are already handled onsite and <br /> distributed offsite via truck. With the RMC plant some product that had left the site as raw sand will <br /> now be utilized in the production of ready mix concrete; reducing the potential impact from truck traffic. <br /> All activities are proposed to take place within the existing operative quarry area and are not expected <br /> to impact traffic levels,dust levels,or noise beyond the property lines. <br /> 2. The uses, values and enjoyment of other property in the neighborhood for purposes already <br /> permitted shall be in no foreseeable manner substantially impaired or diminished by <br /> establishment, maintenance or operation of the conditional use. <br /> Surrounding parcels are a mix of RH-1 rural housing districts,C-2 commercial districts, and Al-EX <br /> agricultural districts. No foreseeable negative impacts to these uses, property value, or enjoyment of <br /> these properties are expected. <br /> The temporary RMC plant will utilize the southern 10 acres of the property which is already operating as <br /> a pit/quarry for the production of RMC. Potential impacts from the installation are similar to those that <br /> already exist from current quarry/pit operations and are easily controllable via implementation of best <br /> management practices such as the use of water for dust suppression, proper material storage practices, <br /> and appropriate waste management and mitigation efforts. <br /> 3. That the establishment of the conditional use will not impede the normal and orderly <br /> development and improvement of the surrounding property for uses permitted in the district. <br /> The RMC batch plant is consistent with existing quarry operations. No activity at the facility is expected <br /> to impact the function of any adjacent or nearby parcel in any way beyond the existing facility function. <br /> 4. That adequate utilities, access roads, drainage, and other necessary site improvements have <br /> been or are being made. <br /> The proposed temporary RMC plant is not expected to demand significant increases in electrical use, <br /> demand for road access,or changes to drainage properties at the site. <br /> No well will be required as water will be supplied for concrete batching by storm water retention ponds <br /> located onsite. Power will be provided by portable generators. Trucks will utilize the existing quarry/pit <br />