Laserfiche WebLink
o Dane County Zoning Division„et' City-County Building., <br /> I <br /> 210 Martin Luther King,Jr.,Blvd., Room 116 <br /> , I TotFfl; Madiso n Wisconsin 53703 <br /> '; n•F s (608) 266-4266/266-9083 Fax (608) 267-1540 <br /> h <br /> DANE COUNTY <br /> CONDITIONAL USE PERMIT # 2381 <br /> THE ZONING AND LAND REGULATION COMMITTEE OF THE DANE COUNTY BOARD <br /> PURSUANT TO SECTION 10.255(2) OF THE DANE COUNTY CODE OF ORDINANCES <br /> DOES HEREBY: <br /> GRANT Conditional Use Permit#2381 for a Concrete Batch Plant for the production of <br /> materials for highway proiects limited to the duration of the project pursuant to Dane County <br /> Code of Ordinance Section 10.123(3) and subject to any conditions contained herein: <br /> EFFECTIVE DATE OF PERMIT: June 28, 2017 <br /> THE CONDITIONAL USE SHALL BE LOCATED ON THE PROPERTY DESCRIBED AS <br /> FOLLOWS: <br /> ADDRESS: None <br /> PARCEL#: 0611-094-9000-5 <br /> LEGAL DESCRIPTION: Commencing at the Southeast corner of Section 9; thence <br /> S88°29'29"W 1331.79 feet to the Southeast corner of the SW 1/4 of the SE A; thence <br /> N00°30'36"E along the East line of Said 1/4 , 263.17 feet; thence N89°29'24"W, 94.75 feet to the <br /> point of beginning; thence continue N89°29'24"W, 195 feet; thence N00°30'36"E, 195 feet; <br /> thence S89°29'24"E, 195 feet; thence S00°30'36"W 195 feet to the point of beginning. The <br /> above described containing 0.87 acres. <br /> CONDITIONS: <br /> 1. The applicant shall submit an erosion control plan covering the area to be disturbed and <br /> receive approval of an erosion control permit prior to commencing extraction operations. <br /> 2. The applicant shall apply for and receive all other required local, state and federal <br /> permits. <br /> 3. The operator shall develop and operate the site according to the site/operations plan <br /> submitted with the application materials. <br /> 4. Operations shall cease no later than December 31, 2019. <br /> 5. The operator and all haulers shall access the CUP site only through those points <br /> currently used for the mineral extraction site. <br /> 6. Hours of operation shall be as follows: <br /> • General daytime hours will be 6:00 am to 8:00 pm Monday through Friday <br /> • Weekend hours will be intermittent as necessary also 6:00 to 8:00 pm <br /> • Only when WisDOT project mandated, operations may occur overnight. <br /> H:\Zoning\ZLR\Conditional Use Permits\CUP 2300's\CUP #2381.doc <br />